ACD in 2006 CERN beam test

ACD in 2006 CERN beam test. Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and maximum 8 tiles upon their availability; single-row chassi with FREE board; and appropriate GASU cables

Download Presentation

ACD in 2006 CERN beam test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: • ACD will be represented in CERN beam test instrument by minimum 4, and maximum 8 tiles upon their availability; single-row chassi with FREE board; and appropriate GASU cables • Preliminary position of the tiles is shown in next slide. Priority in tile positioning is subject for the discussion. Tile 1 is placed on the top of the “tower” space adjacent to the beam, and represents the closest to the real backsplash case. I am concerned that the propagation of Monte Carlo proving over large range of angles may be not correct; 180 degrees with the tile in a plane normal to the beam direction (exact backsplash) is very important direction and has to be validated in a beam test • ACD shall be mounted in the frame which allows flexibility of tile positioning depending on MC results. Tile mounting is done by taping tiles to the frame rather than using flight design of screwing them down

  2. BEAM 1 2 6 BEAM Tracker tower 3 7 4 Tracker tower 5 8 Grid with calorimeter ACD tiles

  3. Positioning of the tiles outside of the container (Idea of L. Baldini) can be considered if it has significant mechanical advantages • Hardware availability:

  4. FREE board and chassi – will be borrowed from SLAC (ACD QualUnit) in the late March. Ready for use • GASU cables – available, both from SLAC (ACD QualUnit) and from GSFC. Check the lengths - Alex • Action items: • Agree ACD tiles number and positioning – Philippe, Eduardo, Benoit, Ronaldo, Alex, all interested – by 01/15/2006 • Agree ACD mechanical arrangement (concept) – INFN, Alex, Gary – by 01/25/2006. Include needed grid modification in the task for machine shop • Approve the use of (doubled) flight spare tile “H” – Eduardo, Dave Thompson, Alex – by 12/31/2005*) • Provide exact dimensions of ACD hardware – Alex, by 12/31/2005 • Provide chassi mockup (if available) and tile (example) to INFN – Alex, 12/31/2005 • Finish detailed ACD mechanical arrangement - INFN, Alex, by 02/28/2006 *). GSFC has 2 flight spare tiles “H” for 6 tiles of the same design in flight ACD. The idea is to use on of these spare tiles, leaving another one as a spare.