90 likes | 328 Views
TPC mode, new BNL VMM1 Elx compare to APV25 Trigger scheme (I ) 1 x 1 m 2 chamber. Test beam 27.07.2012 – 10 .08.2012 H6/SPS CERN – Prevessin. Theo, Paolo. TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011). Jura. 300 run<= 6989 322 7007<run >=6990 16.10..2011, 11: 30. 425. 78.
E N D
TPC mode, new BNL VMM1 Elx compare to APV25 • Trigger scheme (I) • 1 x 1 m2 chamber Test beam 27.07.2012 – 10.08.2012 H6/SPS CERN – Prevessin Theo, Paolo
TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011) Jura 300 run<=6989 322 7007<run>=6990 16.10..2011, 11:30 425 78 113 78 TOP VIEW 1406 CR2-r Large mm μM-R20 stripsX μM-R18 stripsY μM-R21 stripsYX veto Sci s360 s360 44 725 2 2 Beam profile wire chamber x 100 10 20 20 20 μM-R19G stripsXUV s640 z 26 26 26 15 finger Sci (SA) y 170 10 2 s1 Si1 Si3 SC Si6 SB (π-,+120GeV/c) Y-inverted SB SD s1 s1 s1 Saleve movable table 16 4730 SIDE VIEW y s1 s1 s640 s1 26 26 26 z x x s640 s640 s1 Si1 Si6 Si3 50 (π-,+120GeV/c) Y-inverted s360 1155 New movable table 16.10.11 19:30 rotate chambers by 20 degrees μM-R18 (X-Y) used only as Y-strip chamber
H6 test beam 27 July –10Aug Setup • Mechanics: Freiburg support frame with provision to rotate the chambers • Reference systems: • 2 or 4 xy chambers (0.250 mm pitch) – equipped with 1x + 1y APV25 (2 or 4 HDMI cables), mounted on both ends of Freiburg frame • Si telescope (BAT), 3 xy stations at 0.5 – 1 m downstream of MM setup • 8x-strip chambers (0.4 mm pitch) to be tested, mounted on frame back-to-back • 1 x 1 m2 MM (single coordinate) • Trigger: scintillators Electronics: VMM1 (new BNL chip) and APV25 • Reference chambers: 8 APV25 (4 HDMI cables) • All 8 chambers can be equipped with APV25 for TPC mode studies (remove time jitter using ref. MMs ?) • All 8 chambers can be equipped with BNL chip for data readout (TPC mode) • All 8 chambers can be equipped with BNL chip for trigger studies (connected to FPGA evaluation board) Measurements • Systematic studies of BNL chip performance compared to APV25 • Measure resolution as function of track angle (for different Edrift), track reconstruction • Measure performance of 1 x 1 m2 MM (strip length ≥ 1 m)
2012 July Micromegas Test Beam Readout Schematics micromegas (8x) X chambers Tracker (4x) XY chambers Tracker (4x) XY chambers micromegas (8x) X chambers 16x trigger LVDS Tracker (4x) XY chambers micromegas (8x) X chambers micromegas (8x) X chambers tracker (4x) XY chambers micromegas (8x) X chambers micromegas (8x) X chambers 16x micromegas (8x) X chambers micromegas (8x) X chambers APV VMM VMM VMM1 APV AZ Adapter Card 4 x HDMI New “C-Card” ADC-Card (APV) BNL DAQ card Avnet LX9 ADC-Card (APV) FEC switch FEC FPGA Eval Board VMM1 events mmdaq PC SDC APV25 events Trigger data DCS HV/LV, T-H-P External Sci TRG
Services & Electronics • Gas • 93:7 Ar:CO2 • DCS – HV/LV • CAEN Mainframe 2527 2x12 Channel Boards • Supervision PC connected with Ethernet – • PVSS setup • LV – ATX supply for min frame of SRS • DAQ & SDC • mmDAQ + monitoring – • APV25 Readout through SRS – VMM1 Readout • Slow Control for SRS & VMM1
H2 H8 H6 CERN Prevessin Bat 887-EHN1-H6/146 Counting room: HNA 447
Contact Names • Test beam coordination (H6): • Paolo Iengo (Paolo.Iengo@cern.ch, Tel. 168679) • Theo Alexopoulos (Theodoros.Alexopoulos@cern.ch, Tel. 0765439098 ) • Installation: • George Glonti (George.Glonti@cern.ch, Tel. 0764956663) • GiviSekhniaidze (givi.sekhniaidze@cern.ch, Tel. 164453) • DAQ: • MarcinByszewski (marcin.byszewski@cern.ch, Tel. 165537) • DCS: • George Iakovidis (george.iakovidis@cern.ch,Tel. 162858)