1 / 22

Old Main Group

Comprehensive management guide for business, including detailed product group information, financials, and market research data. Cost breakdowns, redesign suggestions, and lessons learned. Hands-on experience for students.

kristophere
Download Presentation

Old Main Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KaLee Allen Mike Berry Jen Dronetti Greg Hofmann Charlie Miracola Business Counterparts: Jeff Drobish Mark Leberknight Ashley Tasker Old Main Group

  2. Business Plan • Authored in Spring 2001 • Overreaching instruction for management of business • Detailed information for six product groups • Financials • Market Research

  3. Old Main FinancialsSpring 2001

  4. Old Main FinancialsSpring 2001

  5. Market Research • A survey of 60 people found: • 52% would pay up to $49 • 22% would pay $50to$99 • 15% would pay $100to$149 • 5% would pay $150or greater • The mean suggested price was:$62.50 • (65% of those surveyed were alumni)

  6. New Market Research • Interviews were conducted of five State College retailers The mean retail price suggested was: $156.11 • 115 Surveys were conducted: (70% of those surveyed were alumni) The average suggested price was$132.50

  7. Product Features: IME I • Features Old Main Replica sculpture • Clock in tower where the clock is located in the actual building • Push button activated projecting and retracting lion • One button to make lion come out, one button to retract lion

  8. Estimated Cost: IME I • Total Cost: $100 (not including machining and labor) • Cost of Materials for Old Main: $60 • Total Weight of Structure: about 15 lbs. • Cost per pound of Stock Aluminum: $1.75 • Total cost includes other preparation • Cost of Materials for Lion Mechanism: $40 • Cost of Motor: $25 • Cost of Clock: $7 • Misc. Costs: $8 • Lion Cost: $4 • Total Machining Cost: $350 • Total Machine Hours: 7 hours • Labor Hour Cost : $10

  9. Redesign Sides should not be solid, too much weight Use Box Tubing for sides Redesign Mechanical and Electrical Components Use a less expensive motor Easy to mount motor Possibly Cast Improvements for Future: IME I

  10. Redesign: IME II • Redesign on overall structure • Smaller clock will be incorporated, which will change overall dimensions to look more proportional. • Tower is not as massive as it was, a little more realistic. • Dimensions of pieces helped ease ordering of pieces close to near net shape for ease in machining, which will help reduce cost.

  11. Redesign: IME II • Redesign of Roof • The depth of the structure is now much smaller, making it more 2-D. • This will reduce the weight of the overall building. • Roof is also being done as a combination of more than one piece, an improvement in the process since last semester.

  12. Redesign: IME II • Redesign of Side Pieces • Side pieces will now be made of extruded tube aluminum, greatly reducing the weight of the structure. • With reduced depth, all of the focus now will be on the front of the structure.

  13. Final Cost Breakdown: IME II • Material Cost (per Old Main): $27.98 • Roof: $12.45 • Building (sides, front, back): $3.39 • Tower: $7.30 • Base: $2.50 • Columns (8): $2.47 • Clock: $6.95 • Machine time and Labor: $90 • Total Cost: $125.04

  14. Lessons Learned: IME I&II • How much is actually involved in designing and prototyping a product from scratch • How to combing efforts in group to put out a final product • How to take constructive criticism • Have a better understanding of the design process of a new product

  15. Lessons Learned: IME I&II • How to take a prototype and make changes to improve the machinability of a product. • How to make changes based on cost, i.e. reduce weight, machine time, material cost. • Understanding how to implement changes for manufacturing. • Understanding the target market’s needs and accommodating them through a product.

  16. IME: Why take it? • Presents students with real life situations, i.e. relationships with vendors, communication with business side. • Entails entire creative process from initial stages of brainstorming to final production of product. • Develops skills of working in teams and ability to work towards a consensus. • Hands on experience.

  17. Old Main FinancialsFall 2001

  18. New Financials • Average Cost Per Unit: Number of units:Price: 12 $140.03 18 $134.15 24 $127.59 100 $127.23 200 $126.00 500 $125.27

  19. New Financials • Net Income (after taxes): Number of units: Net income: 12 $1,082.76 18 $1,710.92 24 $2,410.47 100 $10,073.37 200 $20,348.39 500 $49,434.98

  20. New Financials • Absence of expenses: • No depreciation • No licensing • No plant/maintenance

  21. New Financials

  22. Questions/Comments??? Accepting Job Offers

More Related