160 likes | 171 Views
ECE 135 – Group 3 Presentation 4. Bryan Chavez with Pat Cleary & Kevin Parker February 10 th , 2005. Work Summary. Further Research into VCSELs Researched ROSA Solutions in place of PDs Four Corners Analysis for multiple candidate VCSELs Contact vendors Further Optical Link Budgeting
E N D
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10th, 2005
Work Summary • Further Research into VCSELs • Researched ROSA Solutions in place of PDs • Four Corners Analysis for multiple candidate VCSELs • Contact vendors • Further Optical Link Budgeting • Test and Build Tx Board
Background Work for Four Corners and Optical Link Budget • Eye safe limit → Pmax = 1 mW • From the 802.3 standard → extinction ratio = 9dB • Thus we see that Pmin = Pmax *10^(-9/10) • Pmin = .12589 mW • Maximum Link Power Budget Loss at Rx from 802.3 Standard = 7.5 dB
VCSEL Four Corner Analysis (A) HFE439x-521
VCSEL Four Corner Analysis (B) TO - 46
Tx Board Performance • 0 dB Attenuation • BER: < 10^-9 • 1 Minute Duration
Tx Board Performance • 10 dB Attenuation • BER: < 10^-9 • 1 Minute Duration
Tx Board Performance • 20 dB Attenuation • BER: < 2x10^-7 • 1 Minute Duration
Tx Board Performance • 30 dB Attenuation • BER: NO SIGNAL • 1 Minute Duration
Links for VCSELs & ROSAs • http://www.advancedopticalcomponents.com/documents/HFE438x-521.pdf • http://www.emcore.com/assets/fiber/TO462.5Gbps.pdf • http://www.advancedopticalcomponents.com/product/documents/HFD3381-102.pdf • http://www.advancedopticalcomponents.com/product/documents/HFD3180-108.pdf
Order VCSEL/ROSA Build and Test Rx Board Finalize Optical Link Budget Design Board 1 Schematic Design Board 1 Layout Future Work