GARR/INAF update. EVN-NREN second meeting Oslo, 17/9/2012. Update from GARR. GARR-X backbone almost ready Core routing nodes are installed Transmission core installation 50% Connection of the telescopes Medicina 10G Noto 1G (10G upgrade in 2013) SRT still not connected
E N D
GARR/INAF update EVN-NREN second meeting Oslo, 17/9/2012
Update from GARR • GARR-X backbonealmost ready • Core routingnodes are installed • Transmission core installation 50% • Connection of the telescopes • Medicina 10G • Noto 1G (10G upgrade in 2013) • SRT stillnotconnected • Discussion with Sardiniaregiongovernmentongoing • IRA Bologna (maininstitute) 10G
Update from INAF • Medicina has a MKV-B (the MKV-C is under repair) and willhave a dBBC in October • Noto has ( produces!) the dBBC and MKV-C isoperational • SRT hasseenits first «technical light», will be inaugurated in the nextmonths • First science in 2013 • AlreadyownsMKV-C and dBBC