Cold Operation of a Recirculating CO 2 System at Aachen

Cold Operation of a Recirculating CO 2 System at Aachen. Lutz Feld, Waclaw Karpinski, Jennifer Merz , Michael Wlochal. RWTH Aachen University, 1. Physikalisches Institut B. 10.02.2010 CMS Upgrade Cooling and Mechanics Meeting. Outline. Description of CO 2 test system in Aachen

kyle-dennis
Download Presentation

Cold Operation of a Recirculating CO 2 System at Aachen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cold Operation of a Recirculating CO2 System at Aachen Lutz Feld, Waclaw Karpinski, Jennifer Merz, Michael Wlochal RWTH Aachen University, 1. Physikalisches Institut B 10.02.2010CMS Upgrade Cooling and Mechanics Meeting

  2. Jennifer Merz Outline • Description of CO2 test system in Aachen • Specifications of new chiller • Dryout measurements at room temperature • First measurement at low temperature • Conclusion and outlook

  3. Jennifer Merz CO2 Test System Aachen - Specs • Goals: • Gain experience with a recirculating (closed) CO2 cooling system • Find the lowest possible operating temperature • Determine ideal operating conditions ( stable operation) depending on heat load and coolant temperature • Specifications: • Maximum heat load: 500W • Coolant temperature at detector: -45°C - +20°C • Precise temperature control and flow measurement • Continous operation • Safe operation (maximum pressure 100bar)

  4. Schematic of Test System Chiller 1:Chiller temperature  vapour pressure  system temperature Expansion Vessel: Filled with saturated mixture of CO2-liquid and -vapour -45°C ΔQ ΔQ Burst Disk CO2 Bottle • Heat Exchanger 1: • Heats liquid CO2 to appropriate temperature • Partial condensation of returning CO2 Vacuum Pump Chiller 2:Heat removal Burst Disk Heat Exchanger 2 Heat Exchanger 1 -50°C • Heat Exchanger 2: • Removes heat from the system • Cools incoming CO2 down to about -50°C Detector: 500 W heat load Flow Meter CO2 Pump Burst Disk 4

  5. Jennifer Merz CO2 Cooling Test System CO2-Bottle CO2-Flasche CO2 Bottle Expansion Vessel Detector Heat Exchanger 1 Vacuum-Pump

  6. Jennifer Merz Cooling of Expansion Vessel CO2-Flasche • Copper piping replaced by copper shell • Improvement of thermal contact • Reduction of flow resistance Vacuum-Pump

  7. Jennifer Merz CO2 Cooling Test System CO2-Bottle CO2-Flasche • 6m long stainless steel pipe with 1.5mm outer diameter, in insulated box • 14 thermistors to measure temperature distribution over pipe • Electrical connections to simulate heat load Vacuum-Pump

  8. Jennifer Merz Chillers: unistat 815 • Originally ordered chiller had to be replaced; cooling power was not sufficient • New chiller was damaged during transport • “Old” chiller had to be repaired by company • Chillers now achieve required low temperatures CO2-Bottle CO2-Flasche • Delay in commissioning, system is fully operational since end of January • Chiller specifications: (both chillers identical) unistat 815 • Company: Peter Huber Kältemaschinenbau, Offenburg, Germany • Temperature range: -85°C to 250°C • Cooling power: 1.5kW @ -20°C • 1.4kW @ -40°C • 1.2kW @ -60°C • Pump: max. 40 l/min, max. 0.9bar

  9. Dryout Measurement at Room Temp. • Dryout: Pipe walls not in touch with liquid anymore •  no power dissipation by evaporating CO2 • temperature rises Heat load: 70W Liquid Gas 14 12 10 8 6 4 2 13 11 9 7 5 3 1 • Vary revolutions per minute of CO2 pump •  variation of CO2 flow • Keep heat load constant • Determine when temperature rises over certain level Heat load: 70W

  10. Jennifer Merz Dryout Measurement at Room Temp. 30W 40W 50W 60W 70W •  The lower the flow, the earlier a rise in temperature is observed • The higher the heat load, the more flow is needed Vacuum-Pump

  11. Jennifer Merz First Measurement at Low Temperature • Expansion vessel at -27°C • Chiller 2 at -44°C • No stable operation • Fast variations in CO2 flow • Beginning of dryout visible • System behaviour not yet understood • Operation at low temperatures possible (down to -45°C) if bypass is open; nearly no flow through detector pipe • Chillers work fine (see also next slide) • Flow resistance too high? • More investigation and measurements needed Vacuum-Pump

  12. Chiller Performance Chiller 1 • Both chillers show excellent performance • Low temperatures • Stable operation Nominal Temp. Internal Temp. Chiller 2 Nominal Temp. Internal Temp. Temp. at Exp. Vessel Vacuum-Pump

  13. Jennifer Merz Conclusions and Outlook • CO2 test system in Aachen is finally fully operational • First measurements show that system works in principal • New chillers manage to reach low temperatures • No stable operation at low temperatures possible yet • Investigate how to bring low temperature to detector • Install filter to avoid water and other disturbing particles in system • Determine pressure drop and temperature distribution for different pipe routings and diameter

  14. Jennifer Merz Back Up....

  15. CO2 Enthalpy-Pressure Diagram • Design of cooling plant in p-H-digram • Enthalpy: • H = U + pV “internal energy + expansion work” • ΔH is exchanged heat at constant pressure liquid Pressure, bar liquid + gas gas Enthalpy, kJ/kg

  16. 4 • 2 • 3 • 5 • 6 • 1 CO2 Enthalpy-Pressure Diagram Re-Circulating System (closed system) • Design of cooling plant in p-H-digram • Enthalpy: • H = U + pV “internal energy + expansion work” • ΔH is exchanged heat at constant pressure liquid ΔQ Pressure, bar liquid + gas ΔQ gas Detector load (4-5) Enthalpy, kJ/kg

  17. Jennifer Merz CO2 Cooling System Advantages: • CO2 : low density  small contribution to material budget • Operation at high pressures  small pipe diameter • Low temperatures (-45°C)  good for sensor performance Current tracker (C6F14) vs. tracker with DC-DC converters cooled with CO2 • Power consumption with DC-DC converters: 84W per petal • Including 18.8W power loss of converters, due to converter efficiency of 80% • One aluminium cooling block per converter implemented to dissipate converter power loss TEC Cooling TEC Total Material Budget -38.5% -14.3% Current tracker with C6F14 Layout with DC-DC converters with CO2 A total reduction of 14.3% seems possible with CO2cooling and DC-DC conversion.