1 / 7

Wel -come

Wel -come. Laboratory Presentation National Seminar on Tuberculosis 2071/03/31. Issues/Problems. Laboratory space/condition Lab. Staff scarcity . Relation with DTLO. Unequal distribution of Budget (contact survey, Training, Smear preparation) Infection control.

kylee
Download Presentation

Wel -come

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wel-come

  2. Laboratory Presentation National Seminar on Tuberculosis2071/03/31

  3. Issues/Problems • Laboratory space/condition • Lab. Staff scarcity . • Relation with DTLO. • Unequal distribution of Budget (contact survey, Training, Smear preparation) • Infection control. • Lab. Hazard/Incentive ?

  4. Recommendation/Remedy RQCA post should come under the GON organogram. Insufficient Lab. Staff in RQCC (Med. Tech. - 1, Lab Technician – 2, Lab. Asst. - 2) Infection control (Bio-sefety cabinet -1) Establishment of Gene-Xpert machine with A/C device. Provision of Incentive - reasonalble. (AFB Microscopy, Gene Xpert, HIV testing etc.)

  5. Cont. Supervision to periphery Lab.(Center to Region, District, PHC etc. each MC in a Quarter.) Sufficient budget for each lab. activities. Better to separate the budget for Diagnostic part Observation tour within the country as well as Abroad. Lab. Staff scarcity . (Reserve lab. Staff better be placed at regional level)

  6. Cont. Relation with DTLO/A.(Biasness in TADA, as trainer(smear preparation , DOTS Plus ) ….. etc) QC slide collection should be in time. Involvement of Lab expert in Policy level meeting. Provision of Reward/Punishment. Regional/District lab. related activities by I/NGO, better to co-ordinate with Lab. Staff and DTLO.

More Related