Direct PM 2.5 Emissions Data, Testing, and Monitoring Issues

Direct PM 2.5 Emissions Data, Testing, and Monitoring Issues. Ron Myers myers.ron@epa.gov Measurement Policy Group SPPD, OAQPS. The Issues. Collecting data needed for effective inventories and SIP development Selecting and prescribing appropriate test methods Improving monitoring in rules

kyrie
Download Presentation

Direct PM 2.5 Emissions Data, Testing, and Monitoring Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Direct PM2.5 Emissions Data, Testing, and Monitoring Issues Ron Myers myers.ron@epa.gov Measurement Policy Group SPPD, OAQPS

  2. The Issues • Collecting data needed for effective inventories and SIP development • Selecting and prescribing appropriate test methods • Improving monitoring in rules • Implementing a transition period

  3. Components of Direct PM2.5 • Filterable PM2.5 • Solid or liquid material at stack temperature and higher (measured at ~250o to 320o F) • Stable in atmosphere and collected on ambient sampler • Condensable PM2.5 • Vapor or gas at stack temperature • Condenses to liquid or solid at stack exit • Stable in atmosphere and collected on ambient sampler

  4. Reasons to Consider CondensablePM2.5 Emissions • Condensable fraction of direct PM2.5 can be significant • 10 to 50 percent of PM2.5 emissions depending on control measures, temperature, other source-specific conditions • Combustion, metallurgical & wood product sources emit large quantities of vapors that condense to form PM2.5 • Acids (e.g., sulfuric acid from coal combustion) • Neutralized acids (e.g., [NH4]2[SO4], NH4Cl ) • Organic materials (e.g., alkanes, PAHs, PCBs, PCDDs, acids) • Metals (e.g., As, Se, Sb, Pb compounds) • A small fraction of point sources are responsible for the majority of condensable PM emissions

  5. Inventories and PM2.5 Emissions • Filterable PM • Historically only PM included in databases • Some States include filterable PM10 or PM 2.5 • Condensable PM • Current knowledge is spotty • Some SIP databases fail to include PMcond (even when required) • When PMcond included - calculated from emissions factors (e.g., AP-42) that are often based on incorrect test methods • Inventories reflect database errors • Federal inventory includes some adjustments • Underestimate some sources’ contributions, overestimate others

  6. Effect on SIP Regulations • Most current regulations do not address PMcond • Focus on filterable PM • Force control technology towards filterable PM • Some regulations do include PMcond, but with incorrect test methods • Final rule creates a transition period • Regulations addressing PMcond encouraged but not required • Develop more precise and accurate PMcond emissions for inventories and rules

  7. Preferred N2 purge Evaporation @ 80 F Neutralize quantitatively by titration Optional No purge Evaporation @ 250 F Over neutralize, measure sulfate, assume SO3 EPA Method 202(Condensable PM Test Method) Sample collected in cold water Organic PM extracted with solvent Water & solvent evaporated Residue weighed Procedures • Impact • 10-20X artifact • Lose nitrates, chlorides • Sulfate biased low, SO3 biased high

  8. Test Method Selection is Important for Measuring PMcond • Variations of Method 202 commonly applied • Method 202 can be (and often is) conducted incorrectly • Without N2 purge, dreaded artifacts can form (e.g., SO2 gets trapped in water, reacts with other stuff to form psuedo-PM) • Artifacts can be > PMcond by orders of magnitude • Amount of artifact is source-specific and test-specific – variable and unpredictable

  9. EPA Activities to Resolve PMcond Test Methods Issues • Recommending use of Method 202 with purge and use of condensable PM2.5(see http://www.epa.gov/ttn/emc/methods/method202.html) • Assessing “improvements” to Method 202 • Apply technologies tested in Canada and US • Reduce artifacts from ~10 mg to >2 mg • Revise M202 in Appendix M • More precise (no options) • More accurate (reduce artifacts) • Post on EPA/EMC web site in July 2007 • Propose in 2007/2008 • Promulgate 2008/2009

  10. EPA PM2.5 Transition Period Activities • Recommending use of Method 201A (existing filterable PM10 test method) with supplemental hardware for filterable PM2.5 • Revise Method 201A in Appendix M • Add filterable PM2.5 measurement • Available now on EPA/EMC web site as CTM-040 • Propose 2007/2008 • Promulgate 2008/2009 • Encourage stakeholder testing for Total PM2.5

  11. Other EPA Transition Period Activities • Advance Dilution Sampling Method • Promote ASTM Standard development process • Assess speciation capacity • Improve consistency mobile source methods • Document benefits of improved monitoring • Develop PM2.5 CEMS • Develop guidance on understanding and applying data uncertainty

  12. April 2008 SIP expectations • States are encouraged to evaluate and control sources of condensable PM2.5 that may be important in attainment strategies • However, emissions limits (e.g., RACT, RACM) in 2008 are not required to include condensable PM2.5 • If want credit for condensable PM2.5 reductions, must ensure those reductions with enforceable emission limits

  13. Your Direct PM2.5 SIP Activities • By 2011 - transition period • Collect information on PM2.5 filterable and condensable • Include PMcond at your option • In new rules with appropriate test methods • As supplemental testing with filterable PM • Incremental cost ≈$700 • Populate emissions factors database • Use Electronic Reporting Tool to document emissions tests (http://www.epa.gov/ttn/chief/ert/ert_tool.html )

  14. Your Direct PM2.5 SIP Activities • Post 2011 • Use information obtained during transition period • Improve direct PM2.5 emissions inventory • Revise control strategies • Revise or establish new PM2.5 limits • Not necessary to REVISIT old limits • Must incorporate condensable PM in NEW limits • e.g. SIPs to make mid-course corrections • SIPs for 2006 PM2.5 standards • Improve monitoring methods • Improve management of short term emissions • Start up/shut down/malfunction • Continuous performance assessment

  15. Important Monitoring Elements • Indicator of performance • Emission measurements • Operating parameters • Work practice • Raw material or fuel content • Monitoring technique • Continuous emissions monitor • High Sensitivity PM monitor • Continuous opacity monitor • Continuous parametric monitoring • Monitoring frequency • Averaging time

  16. Summary - Direct PM2.5 Emissions Issues • Both filterable and condensable PM2,5 are important components direct PM2.5 • Databases must address both for all sources to ensure effective control program • Target significant sources • Establish technologically correct regulations • Test methods and monitoring must correspond with emissions limitations • You get what you measure