1 / 8

RHIC Low-Energy Operations Todd Satogata Weekly Experiment Meeting March 4, 2008

RHIC Low-Energy Operations Todd Satogata Weekly Experiment Meeting March 4, 2008. With help from: L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, X. Chang, W. Christie, A. Drees, A. Fedotov, W. Fischer, J. Gullotta, P. Harvey, T. Hayes, W. Jappe, R.C. Lee, W. W. MacKay,

kyrie
Download Presentation

RHIC Low-Energy Operations Todd Satogata Weekly Experiment Meeting March 4, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Low-Energy OperationsTodd SatogataWeekly Experiment MeetingMarch 4, 2008 With help from: L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, X. Chang, W. Christie, A. Drees, A. Fedotov, W. Fischer, J. Gullotta, P. Harvey, T. Hayes, W. Jappe, R.C. Lee, W. W. MacKay, N. Malitsky, G. Marr, R. Michnoff, B. Oerter, E. Pozdeyev, F. Severino, K. Smith, P. Sorensen, S. Tepikian, N. Tsoupas and surely others too! • A (brief) history of RHIC low energy • Challenges and resolutions • Planning and schedule

  2. Searching For The QCD Critical Point: Lots of Interest • Two Years Ago: RIKEN workshop at BNL, Mar 9-10 2006 • “...a growing body of theoretical and experimental evidence that the critical point on the QCD phase diagram, if it exists, should appear on the QGP transition boundary at baryo-chemical potential ~100 - 500 MeV, corresponding to heavy ion collisions with c.m. energy in the range sNN = 5 - 50 GeV.” • Critical Point and Onset of Deconfinement Workshop at GSI, Jul 9-13 2007 • 141 registered participants from 3 continents; 66 presentations • 160 papers on “QCD critical point” in Google Scholar • 112/160 mention RHIC low energy (or, as George Stephens puts it, “critRHIC”) A. Cho, Science, 312 (14 Apr 2006) T. Satogata RHIC Low-Energy Plans

  3. Low Energy Test Run and Lowest Energy Parameters • Several staged low energy tests • Systematically address challenges • Leverage available beams • Establish luminosity scaling • Permit time for upgrade strategy • 2006 proton test run a success! • 2007 Au test run (1 day) • Leverage proton test rigidity setup • Test RF/timing changes • Measure luminosity • Test experiment DAQs • 2008 Au test run (March 10-12) • 2007 9 GeV setup “in the can” • Test RF/timing fixes • Reproduce 2007 Au test; physics • Explore near lowest energy • Establish lowest energy baseline T. Satogata RHIC Low-Energy Plans

  4. Challenges: RHIC RF Harmonic Number • Nominal RHIC RF: h=360 bunches • RHIC RF tuning range: 28-28.17 MHz • With lower energy, RHIC RF frequency cannot fall low enough to maintain h=360 • Must raise harmonic number • Retuning cavities is a prohibitive effort • Collisions at both experiments require h(mod3)=0; Experiment DAQs also requires h(mod3)=0 • All beam-synchronous clocks are driven by this clock • All RHIC single-bunch instrumentation • Abort system (needs to find gap) • Experiment DAQ clocks • A problem during Run-7 testing • Fixed, Tested in August 2007 • BPM clock decoding fix complete h=360 120 bunch fill pattern Yellow Blue T. Satogata RHIC Low-Energy Plans

  5. Challenges: Chromaticity and Stability • Low-energy transverse beam stability requires negative chromaticity • Sextupole component of main dipoles drives vertical chromaticity beyond unipolar power supply tuning range • Below sNN = 9.3 GeV/u, we require 1 day of maintenance to flip defocusing sextupole power supply leads at power supplies • Strong octupoles were used to stabilize beam during the 2006/7 test runs • But that adversely affected beam lifetime... Defocusing sextupole strength should sum to negative T. Satogata RHIC Low-Energy Plans

  6. 2007 Gold Test Run: STAR Vernier Scans 1500 • Measured beam size ~ 4mm at *=10m <10% backgrounds • 700-1000 Hz BBC coincidences Peak luminosity ~1.5 x 1024 cm-2 s-1 Uncogging +/-6mm Vernier Scan +/-9mm Vernier Scan STAR BBC Coinc 0 35 Few losses from scan! Au Beam [e9] 0 T. Satogata RHIC Low-Energy Plans

  7. The Fly In The Ointment P. Sorensen/STAR Dec 19 2007 • STAR sNN=9.2 GeV saw 18 primary vertices/2500 events • Believe that 2007 BBC coincidences were not collisions • But their trigger clocks at the time were also “a bit woogidy” T. Satogata RHIC Low-Energy Plans

  8. Mar 2008 Low Energy Test Run Plan and Objectives • 6/7 Mar: Tandem/Booster/AGS Au PPM setup • 10 Mar 08:00-12:00ish • Swap defocusing sextupole leads (at power supplies only) • Set up h=366 RF/clock; test experiment triggers, instrumentation • Test h=387/h=384 RF/clock; test experiment triggers, instrumentation • Optimize Tandem/NSRL dual-species operation • 10 Mar 12:00ish-11 Mar 12:00ish • Restore sNN=9.2 GeV ramp/setup; check/adjust for PHENIX BBC • Machine tuning, lifetime optimization • Vernier scans (with STAR BBCx&&CTB triggers) • Measure cross sections, luminosity, lumi lifetime with experiments • Acquire sNN=9.2 GeV data at both experiments • 11 Mar 12:00ish-12 Mar 08:00 (end of run) • Install sNN=5.0 GeV setup (or sNN=5.2 GeV if h=387 problems) • Machine tuning, lifetime optimization • Measure inj efficiency, beam lifetime; evaluate chrom, beam optics • Evaluate collision/background signals; collect short data run? T. Satogata RHIC Low-Energy Plans