290 likes | 449 Views
The Evolution of the TERRA Crystal Galleries Mineral Showroom. The Evolution of the TERRA Crystal Galleries Mineral Showroom. A work in progress lasting 7 long years…. - 1995 to 1998 - Uncapped rock is left in ½ of the basement pending future development ideas …. - 1999 -
E N D
The Evolution of the TERRA Crystal GalleriesMineral Showroom
The Evolution of the TERRA Crystal GalleriesMineral Showroom A work in progress lasting 7 long years….
- 1995 to 1998 - Uncapped rock is left in ½ of the basement pending future development ideas …..
- 1999 - Excavation begins!
- 1999 to 2004 - Slow progress is made….
As the rock is whittled and hauled away, bit by bit ….
- June 2005 - And is turned into walls and used as fill around the property…
- June 2005 - The excavation is complete, the footings poured and the floor is prepared for concrete….
- Gyprocdust! • October 2005 – • Jim wires and puts up gyproc ….
- - November 2005 - The gyproc is completed and the room is painted ….
- November 2005 - The furniture is built and painted before the floor is painted and the carpet installed ….
- December 2005 - The carpet is installed and so is the lighting ….
- December 2005 - Rocks are unpacked and reviewed ….
- December 2005 - Furniture is assembled ….
- December 2005 - The room starts to come together ….
The end (finally!) We hope that you enjoyed your virtual visit to TERRA Crystal Galleries ….