An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Houy Sam Mor Sub River Basin Committee, Case Study by Ms. Pakawan Chufamanee Director of Mekong Affairs Division, Bureau of International Cooperation, Department of Water Resources, Ministry of Natural Resources and Environment, Thailand

  2. Map of Houy Sam Mor Chi River Basin Houy Sam Mor

  3. Why BDP1 selected Houy Sam Mor as Pilot area? 1. Small basin which easy to manage 2. Existing Working Group is in place 3. People in the area demand the river management system 4. Enough data/information to move forward

  4. Topography of Houy Sam Mor Patao Hydropower Houy Sam Mor

  5. Time Line • 2003 - Chi River Basin Committee was established • 2006 - Houy Sam Mor Sub – River Basin was • established as the pilot area of DWR • - BDP1 support a part of budget on planning • process • 2008 - World Bank support as a part of RBC study • - GTZ support on Watershed Management • Project • 2009 - Continue planning process by M – IWRMP • 2010 - Share experience to sub-basin network in • Chi Basin

  6. Houy Sam Mor Network • During 2006 – 2008, network in Houy Sam Mor • was established: • Woman Volunteer Network • Youth Volunteer Network Working Group • Local Curriculum Academic Network • Stakeholder network should be continually established • to accomplish Houy Sam Mor community plan as an • original plan.

  7. Working map prepared by stakeholders

  8. Capacity Building • Implementation plan is proposed to improve capacity • of people that they can manage water resources • properly: • Accelerate to formulate proper law and reinforce it • Awareness raising and networking • River basin study and monitoring • Capacity building of river basin committee • Improvement of network • Database Development • Monitoring and evaluation • River Basin Development • River Basin Development Fund

  9. Existing Management in Houy Sam Mor • Working Group under Chi RBC • Focus participatory planning process • Apply database from line agencies and network • as a tool for natural resources management • Follow current vision, strategy and community • plan • Adopted informal working to decrease pressure • of Working Group

  10. Lesson Learnt • Active leader and working group • Area based planning with stakeholder engagement • Share experience and expand sub-basin network • Knowledge transfer • Following planning process • Motivate planning projects to be done • in accordance with sub-basin strategy (7 reservoirs, • (groundwater development etc.) • Link among MRC programme to support activities

  11. Lesson Learnt (Con’t) • Most WG member from local people are enthusiastic • and fully participated in proposing their opinions • and solving the area problems • Joint effective budget (DWR, BDP, WB, GTZ) • Link with agencies and local administrations budget • on implementation