100 likes | 263 Views
Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center rac@slac.stanford.edu 650-926-2989. LAT ISOC in the GLAST GDS. Analysis Software. LAT ISOC Objectives. The LAT ISOC is organized to:
E N D
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center rac@slac.stanford.edu 650-926-2989
LAT ISOC in the GLAST GDS Analysis Software
LAT ISOC Objectives • The LAT ISOC is organized to: • Safely operate the instrument • Produce the LAT science data products • Functions: • Mission planning and command generation • Health and safety monitoring • Maintain and modify flight software and testbed • LAT performance verification and optimization • Process and archive Level 1 and Level 2 data • Support science analysis software • Data and software management
ISOC Teams • CHS • “Front-end” instrument operations • FSW • Joins ISOC after FSQ (Mid 2005) • PVO • Follows from SVAC in I&T • Science Products • Runs pipeline, generates Level 1 (and some L2) products • SAS • Software tools to support science analysis • ISOC will work with various LAT project elements during pre-launch activities, to ensure smooth transition into ops phase • ISOC will coordinate activities with Science Working Groups, overseen by LAT Steering Committee
Software Architecture: Primary Data Flows LAT ISOC Level 1&2 Sci Data Products Level 1&2 Sci Data Products, LAT Timeline Level 0 Sci Data Receive & Archive Science Data Analysis Pipeline Archive & Send MOC GSSC Level 0 Data, LAT Alerts, Integrated Observ. Timeline, Spacecraft Timeline, As-Flown Timeline, Flight Dynamics Products, SC Incident Reports, PDB updates Level 0 Hkpg Data, LAT Alerts CHS monitoring & trending Integrated Observ. Timeline, Spacecraft Timeline, As-Flown Timeline, Flight Dynamics Products Contingency: LAT Instrument Commands, LAT Instrument Loads, LAT Timeline Mission Planning GSSC Archive & Send Receive & Archive MOC Prelim. Science Timeline, Long Term Science Schedule, Observ. Timeline Package LAT Incident Reports, LAT T&C Database Updates Tested OK Commands to Verify LAT Test Bed All data into ISOC, and products out Alerts, Logs, Process status, File status Anomaly Tracking & Notification System Database Web Access
Operations Coverage • Weekday, day-time operations • Mission planning, command building • Operator shift coverage • 5 am to 2 pm to cover MOC shift times on East Coast • 9 am to 6 pm to cover ISOC internal coordination needs • Telemetry monitoring and science data processing: 24/7 • Continuous automatic processing • On-call support available 24/7 • Support for targets of opportunity, anomalies • Operators for real-time commanding or anomaly support • Software engineer for emergency software support • Computer technician for computer/network support • Team Lead and Instrument Physicist for anomalies
ISOC Operations Facility • Working with SLAC management and Facilities group to define near-term ISOC operations facility. Coordinating ISOC space requirements with LAT project management. • Near-term ISOC facility: a new temporary building at SLAC • Long-term ISOC facility: discussions are starting with SLAC and KIPAC management on ISOC facility in new Kavli building at SLAC, available 2006. Also ISOC presence on Stanford campus.
ISOC Development Schedule Phase / Milestone Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 ISOC CDR GSDR ITOS setup/configuration ISOC Verif. with Test Bed DB/Web/E-logbook Dev Plotting/Trending Dev Mission Planning Dev Diagnostic Tool Dev ISOC Demos ISOC Simulation Testing ISOC SW Releases 1 4 2 3 Ground Readiness Tests 3 4 7 2 6 5 End-to-End Tests 6 5 4 3 1 2 Environmental tests at NRL ISOC testing at NRL ISOC ready to take over LAT operation ISOC used to I/F with LAT (front-door only) Mission Simulations Launch SW Dev Slack Times