Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science Operations CenterCDR Section 5 Software Architecture Steve Culp SLAC sculp@slac.stanford.edu 650-926-8987
Agenda • Requirements Mapped to Software • Software Architecture • Development and Testing Schedule • Staffing Level (ROM) • Demo
Requirements Mapped to Software • Reviewed all ISOC level III requirements • Identified which required software • Identified existing tools which satisfied all or part of reqt • Identified where new development needed
Requirements breakdown • Each requirement was identified as: • Procedural (non-software) 42 • Existing software (commercial or other well-established software -- i.e. implementation Done!) 277 • Under development by SAS(mostly done, refer to SAS for status) 39 • To be developed by others (I&T, FSW, ITOS) 21 • Remaining new development 88 total 467 • Some requirements map to multiple categories or SW tools, so total exceeds total number of level IIIs (379)
Primary Software Data Flows LAT ISOC Level 1&2 Sci Data Products, LAT Science Activity Timeline, LAT Instrument Commands, LAT Instrument Loads Level 1&2 Sci Data Products Level 0 Sci Data Receive & Archive Science Data Analysis Pipeline Archive & Send MOC GSSC Level 0 Data, Integrated Observ. Timeline, As-Flown Timeline, Flight Dynamics Products, Anomaly Reports, PDB updates, LAT/GBM Sci Alerts, LAT/GBM/SC Problem Alerts Level 0 Hkpg Data CHS monitoring & trending Integrated Observ. Timeline, As-Flown Timeline, Flight Dynamics Products LAT Science Activity Timeline, LAT Instrument Commands, LAT Instrument Loads Contingency: LAT Instrument Commands, LAT Instrument Loads Mission Planning GSSC Archive & Send MOC Science Plan Receive & Archive Tested OK Commands to Verify All data into ISOC, and products out LAT Test Bed Alerts, Logs, Process status, File status Anomaly Tracking & Notification System Database Web Access
Automatic Telemetry Processing LAT ISOC Science Data Analysis Pipeline Calib. DB Calibration Trending GINO & FastCopy/DTS GINO & FastCopy/DTS Level 0 sci & hkpg telemetry Level 1 processing GSSC MOC Receive & Archive Apply Calibration Recon- struction System-level Monitor Archive & Send Level 0 science telemetry Level 1 & 2 data products Level 2 processing Subsystem- level monitor GCN Transient Search Level 0 hkpg telemetry Realtime Level 0 hkpg telemetry (during contacts) Alerts, Logs, Process status, File status ITOS Reports, Log entries, Data Products received and sent Text & Stripchart displays (optional) Monitor hkpg parameters FASAT Anomaly Tracking & Notification System Monitor Trends Database ITOS Monitor Data STOL Config monitor scripts Beeper / email message Beeper / email message
Command and TelemetryDefinition File Verification LAT ISOC Modify .dbx file(s) .dbx files MOC Project Database (master Cmd &Tlm definitions) OK (test passed with new .dbx file(s) ITOS CCSDS Commands LAT Testbed Replay Commands & Receive Telemetry telemetry Command log, error log and optional Text/Stripchart displays Test Suite of STOL Commands
Command Load Generation & Verification LAT ISOC Command Load (new) GSSC Generate Command Load & Perform Constraint Checking Verified OK STOL commands ITOS CCSDS Commands Issue Commands & Receive Telemetry LAT Test Bed telemetry Command log, error log and optional Text/Stripchart displays
Data Display and Analysis Support • Web access • Data products (logs, reports, level 0/1/2 data) • Electronic logbook provides log entry, log and report viewing, and file download • Password protection on privileged actions (e.g. log entry, data download) • Tools • Includes ROOT, HippoDraw, IDL, and JAS • Used in ISOC to generate reports accessible over web • Data download allows users to process data locally with tools installed on their machine
Electronic Logbook • Running record of ISOC and its data products in and out • Program currently in use by I&T can meet ISOC requirements • All entries go in relational database • Web-accessible • Includes • Record of data products received and sent and links to each • User comments • Time tag on each entry • Suggested Metric for ISOC • Response times – e.g. from receipt of level 0 data to sending of level 1 & 2 products
ISOC Network and Hardware Architecture SLAC Internet LAT ISOC Web Server … Firewall Firewall Linux PC (Realtime connection ITOS) Linux PC (Hkpg Replay ITOS) SAS/SP Workstations PVO Workstations FSW Workstations CHS Workstations SCS CPU Farm Abilene Network Firewall Gateway System (Oracle, GINO, FastCopy/DTS) MOC SCS Storage Farm GSSC Solaris Workstation (VxWorks tools) LAT Test Bed 1553 Linux PC (Test Bed ITOS) SIIS (S/C Sim) Anomaly Tracking & Notification System LVDS LAT Test Bed Lab
Testing • Four software releases • Each level 3 requirement will • be mapped to the release where first needed • have test procedures defined • Each release includes functionality required for subsequent GRTs • R3 (Dec 05) includes all requirements • R4 (Jul 06) includes enhancements based on user experience (e.g. during Mission Simulation) • Two weeks prior to each release • test that requirements newly included in that release are met • regression test previously included requirements
ISOC Software Development Schedule Phase / Milestone Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 ISOC CDR ITOS setup/configuration ISOC Verif. with Test Bed Diagnostic Tool Dev Mission Planning Dev DB/Web/E-logbook Dev Plotting/Trending Dev SW enhancements ISOC Demos ISOC Simulation Testing ISOC SW Releases 1 4 2 3 Ground Readiness Tests 3 4 7 2 6 5 End-to-End Tests 6 5 4 3 1 2 Environmental tests at NRL ISOC testing at NRL ISOC ready to take over LAT operation ISOC used to I/F with LAT (front-door only) Mission Simulations Launch SW Dev Slack Times
Staffing Level (ROM) • Based on review of level 3 requirements • Average LOC per reqt is >10 and <100 • 80 LOC per reqt appears conservative (probably high) • Of 467 reqts, 88 remain to be developed and all need to be verified • 88 reqts x 80 LOC/reqt = ~7,000 LOC (ROM) • Estimate 2,000 LOC per programmer per year • 7,000 LOC to develop / 2,000 LOC/pgmr-yr = 3.5 programmer years • Release 4 is July 06 • ~ 2 calendar years of development • But with slack time and more intensive 1st year of development, need 3 programmers + 1 tester
Status • Architecture concept is solid • Ready to proceed • Refine and document software design • Implement it • Lots of testing and demos • I.e. lots of work to do…
ITOS Demo Play back simulated LAT housekeeping telemetry • In real-time --this simulates: • Real-time connection to MOC for S/C contact periods • ISOC test bed use for verifying command sequences and ITOS Command & Telemetry definition files • Fast replay --this simulates: • Rapid replay of LAT and S/C housekeeping data files received from MOC after download from SSR • Examine print file generated during playback • Configured to record parameters of interest • Available for download through e-logbook