3.53k likes | 10.66k Views
On-Site Emergency Mock Drill. PELLET PLANT Location: FO Line heater. Date : 21.05.2016 Time : 3.30 PM. Scenario Considered for Emergency Declaration :.
E N D
On-Site Emergency Mock Drill PELLET PLANT Location: FO Line heater Date : 21.05.2016 Time : 3.30 PM.
Scenario Considered for Emergency Declaration : Scenario:There was a fire in FO line heater due to leakage of FO through gaskets. Due to blazing flames the helper who was doing housekeeping work near the area sustained burn injuries & got fainted near due to heavy smoke/heat. The co-worker passed on this massage to the shift in-charge who intern passed on massage to the Incident Controller. The Emergency Controller on receiving massage from Incident Controller declared the emergency immediate after rushing to the emergency spot to have a immediate control on the emergency.
Incident Controller and Emergency Controller rushing towards the emergency affected location.
Emergency Controller instructing Control Room to declare the emergency
Fire Tender and Ambulance rushed to the emergency affected site.
Fire Station crew controlling the fire emergency. Emergency Controller leading the operation.
Employees gathering at safe assembly point point
Search and Rescue team reporting to the Emergency Controller
OHC and Fire & Emergency control team reporting to Emergency Controller
Security and Time Office team reporting to the Emergency controller
DGM Safety sharing the MOCK DRILL observations & corrective measures