An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Canadian CourtIntermodal Transportation Center Board of County Commissioners April 17, 2007

  2. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  3. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  4. Background

  5. Background • I-Drive Activity Center • Convention Center • Hotels/Retail/Commercial • Theme Parks/Attractions • Employment Center

  6. Background • Canadian Court Intermodal Center • Centralized Transportation Hub for the I-Drive Resort Area • Incorporate Regional Transit Initiatives • Facilitate Mobility Alternatives • Improve Access to Convention Center

  7. Background • Existing Transit System: • LYNX Buses • I-Ride Trolley • OCCC Shuttle Service • Private Transportation Providers

  8. Background • Planned Transit Systems: • Light Rail • Cross-State Rail • Beeline Monorail • High Speed Rail • I-Drive Circulator • Commuter Rail • Connectivity

  9. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Summary • Requested Action

  10. Regional Transit Initiatives

  11. Regional Transit Initiatives • Light Rail • North/South Corridor • OIA Connector • Cross-State Rail (Coast-to-Coast) • Beeline Monorail • High Speed Rail • I-Drive Circulator

  12. Regional Transit Initiatives • Light Rail – North/South Corridor • Downtown to I-Drive • Initial Operating Segment • Project canceled 1999

  13. Regional Transit Initiatives • Light Rail - OIA Connector • I-Drive to Orlando International Airport • Alternatives Analysis 2003-2005 • No further funding identified

  14. Regional Transit Initiatives • Light Rail – North/South Corridor • Altamonte Springs to I-Drive • Re-study of previous project • SDEIS 2003-2004 • No further funding identified

  15. Regional Transit Initiatives • Beeline Monorail • I-Drive to Airport to Port Canaveral • Private Proposal • FDOT lease of SR 528 Corridor • Private Partner funding not demonstrated to FDOT • FDOT lease offer withdrawn in 2001

  16. Regional Transit Initiatives • Cross-State Rail (Coast-to-Coast) • Tampa/St. Pete to Port Canaveral • Public/Private Partnership • Florida 2012 Olympic bid • Feasibility Study • High Speed Rail Amendment passed • Olympic bid unsuccessful • No further funding identified

  17. Regional Transit Initiatives • High Speed Rail • Tampa to Orlando to Miami • Constitutional Amendment • SR 417 vs. SR 528 Alignment debate • Amendment Repealed in Nov. 2004

  18. Regional Transit Initiatives • I-Drive Circulator • I-Drive/Universal Boulevard Corridors • Local System - Connectivity to Regional Transit • Alternatives Analysis 2003-2005 • No further funding identified

  19. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  20. Timeline • 1998 - Initial CCITC Concept • 1999 - Light Rail Project canceled • 2001 - Beeline Monorail lease withdrawn • 2001 - Cross-State Rail Feasibility Study • 2002 - Florida 2012 Olympic bid lost • 2004 - High Speed Rail repealed • 2005 - Commuter Rail emerges as regional transit priority

  21. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  22. PD&E Study • Public Involvement • Data Collection • Master Planning • Project Programming • Financial Planning • Environmental Assessment • Preliminary Design • Exclusive Bus Corridor Planning

  23. PD&E Study

  24. PD&E Study

  25. PD&E Study

  26. PD&E Study

  27. PD&E Study

  28. PD&E Study • Bus Bays • 12 for LYNX • 6-7 for I-Ride Trolley • 2 for other shuttles • CRT Connectivity Requirements • Canopy Shelter, Passenger Loading and Waiting Areas • Exclusive Bus Corridor

  29. PD&E Study • Building • Passenger Waiting/Ticketing • Operations • Offices • Restrooms/Vending • Parking • Improved Pedestrian Connections

  30. PD&E Study

  31. PD&E Study

  32. LRT To Downtown I-Drive Circulator To Convention Center Rail To OIA Rail To Tampa LRT To OIA I-Drive Circulator To Sea World PD&E Study

  33. PD&E Study • Ultimate Concept • “Gateway” to the I-Drive Area • Light Rail Station • International Drive Circulator Station • High Speed Rail Station • OIA Remote Baggage Handling • Transit Oriented Development

  34. PD&E Study

  35. PD&E Study

  36. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  37. Challenges • Regional Transit Project Uncertainty • High Capacity Rail Essential for ultimate project development • Market Assessment • Public/Private Partnership • Rental Car Survey • OIA Remote Baggage Handling

  38. Challenges • Final Design Concept • Requires private-sector input • Continued expenditure on design not fiscally responsible • Capital Funding not currently available

  39. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  40. Funding • TOPs Grant - $3M • TOPs Program Terminates in FY 2007 • PD&E Study Under Contract - $2.1M • Anticipated Expenditure - $1.1M • Anticipated Grant Balance - $1.9M • Construction Funding not in • Current CIP

  41. Funding • Capital Funding not available - $30M+ • Public/Private Partnership • Scenario not determined • Dependent upon high capacity transit

  42. Summary • Significant project planning completed • TOPs Program being terminated • Capital funding not available • High Capacity Transit and OIA Connection Required for private investment • Private development concept necessary for further design expenditure to be useful

  43. Presentation Outline • Background • Regional Transit Initiatives • Timeline • PD&E Study • Challenges • Funding • Requested Action

  44. Requested Action • Approval to request that the FDOT apply the remaining balance of the TOPs grant for the CCITC to other transit-related projects in the general vicinity of the CCITC and, further, authorization for the Mayor to transmit a letter to FDOT formalizing this request.