OPRG Status Report. 35 Checklist were reviewed and accepted by the review group for the current operating season teleconference by mid-march to review and accept the checklists/procedure for the spring season. OPRG Responsibility.
E N D
OPRG Status Report • 35 Checklist were reviewed and accepted by the review group for the current operating season • teleconference by mid-march to review and accept the checklists/procedure for the spring season.
OPRG Responsibility OPS is responsible for reviewing and accepting the operating procedures before the start of a new operating season and has delegated this responsibility to OPRG…”
OPRG Members • Brian Tuck, Bonneville Power Administration • Jerry Mossing, Alberta Electric System Operator • Mike Flores, Tucson Electric Company • Tom Isham, Arizona Public Service • Robin Manuguid, Sempra Utilities • Mark Willis, Sacramento Municipal Utilities District • Robert Johnson, Xcel Energy • Joe Liberatore, Western Area Power Administration • Anitha Neve, WECC Staff Liaison
OPRG checks for • Approved value of OTC limit is specified • Specification of stability or thermal limit and time limit requirement to get back within otc is included • Coordination with other entities is verified • Steps taken to bring operation within the nomogram if needed.