1 / 9

2012 RPC calibration ( HV scan )

2012 RPC calibration ( HV scan ). Pigi Paolucci Marcello Abbrescia Juan Pablo Gomez Camilo Carrillo Davide Piccolo. Introduction. 2012 HV scan calibration was about 12 hours long 2011 was a week long 3 runs: 190661, 190663 and 190678 8 HV points in barrel 11 HV points in endcap

lane-beard
Download Presentation

2012 RPC calibration ( HV scan )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2012 RPC calibration(HV scan) Pigi Paolucci Marcello Abbrescia Juan Pablo Gomez Camilo Carrillo Davide Piccolo HV scan team - XEB meeting 7 May

  2. Introduction • 2012 HV scan calibration was about 12 hours long • 2011 was a week long • 3 runs: 190661, 190663 and 190678 • 8 HV points in barrel • 11 HV points in endcap • Lumi with bad RPC: 13.2 pb-1 • One more calibration at the end of 2012 HV scan team - XEB meeting 7 May

  3. Few Plateau examples 42 not well characterized rolls 2085 well characterized rolls 96% of the total RE3 shifted 100 Volt 47 off rolls HV scan team - XEB meeting 7 May

  4. Average Plateau 2012-2011 Barrel Endcap 2011 barrel 2012 barrel 2011 endcap 2012 endcap HV scan team - XEB meeting 7 May

  5. SigmoidFit • Very good fit as it was in the 2011 • No difference between barrel and endcap 2011 2012 HV scan team - XEB meeting 7 May

  6. HV pointat 50% of the efficiency 2011 2012 endcap barrel • HV 50 is a verypowerfullvariable to spot agingaffect. • None todayafterabout 7 years of first chamberoperation HV scan team - XEB meeting 7 May

  7. HV50distributions per disk + barrel HV scan team - XEB meeting 7 May

  8. Efficiency .vs. HV offset HV scan team - XEB meeting 7 May

  9. Efficiencyat WP (disk + barrel) HV scan team - XEB meeting 7 May

More Related