RPC project organization 2011-2012 P. Paolucci
RPC Institution Board • IB Rules are written in the CMS constitution • All the Institution leaders are member of the RPC IB • We meet at least 4 times (CMS week) • National representative can be invited ? Yes • Managers and experts can be invited to discuss special arguments • IB chairman will be vote in the March CMS week and he will follow all these aspects: • Meeting organization • Work very close to the PM • Special issue (papers, conferences……) RPC IB - Pigi Paolucci
Introduction Steps toward the new RPC project organization • Today • Endorse RPC project organization chart • Endorse deputies PM • Endorse new RC • Endorse deputy RC and TC • Open call for the IB, EB, CC, Upgrade, Steering chairmen • January 19th • Deadline for chairmen nominations • Deadline for DPG, TC, RC & Upgrade LV3 coordinators • March CMS week • Vote chairmen • Endorse the full list of DPG, TC, RC & Upgrade coordinators RPC IB - Pigi Paolucci
Conference Committee chairman Editorial board chairman Istitution Board chairman Resource manager P. Paolucci Project Manager P. Paolucci deputy/deputy Steering committee Tech. Coordination S. Buontempo deputy DPG D. Piccolo K. Bunkowski Run Coordinator G. Pugliese deputy Upgrade Resp. deputy RPC IB - Pigi Paolucci
Resource manager (P. Paolucci) Project Manager (P. Paolucci) deputy/deputy Steering committee DPG D. Piccolo K. Bunkowski Run Coordinator G. Pugliese deputy Tech. Coordinator S. Buontempo deputy Maint & repar Resp. new Physic Valid Tool Resp. Online K. Bunkowski new Elect. Coord. Paolucci CAF Resp. new Offline D. Piccolo Gas Resp. P5 Resp. new Detector & trigger analysis C. Carillo Upgrade Resp. new …………. Resp. RPC IB - Pigi Paolucci
2011-2012 LV2 Positions to endorsetoday • Deputies Project Manager G. Pugliese (Bari) and M. Tytgat (Ghent) • Run Coordinator: L. Benussi (LNF) Deputy Run Coordinator: March 2011 • Tech. Coordinator: S. Buontempo (Napoli) Deputy Technical Coordinator: A. Dimitrov (Sofia) RPC IB - Pigi Paolucci
DPG organization chart • New DPG organization chart (2011-2012) based on 4 correlated sectors: Online – Offline – Physic validation tools (new) – detector & trigger analysis (new) • We would like to endorse the chart today • Define and endorse all the responsibilities at the first 2011 DPG meeting • Korea interest in DQM (Korea Univ.) and Trigger analysis (SKK Univ.) • What about all the other people interested in participating to the RPC analysis ? RPC IB - Pigi Paolucci
DPG (D. Piccolo) K. Bunkowski Run Coordinator (G. Pugliese) deputy Detector & trigger analysis Resp. Phys Valid Tool Resp. Offline Piccolo Online K. Bunkowski Local Reco C. Carrillo DQM Cimmino ConfigurationK. Bunkowski Detector perfomance Calabria SoftwareValidation/ Data Certification J. Gho Detector DB Trigger perfomance Resp. Run Quality Korea Simulation Pavlov Trigger DB M Szlepper Calibration Streams Maggi Noise tools Costantini DataBase DCS WBM Berzano Upgrade Simulation Skims Tupputi Covered RPC IB - Pigi Paolucci Manpower needed Not covered
Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE,RE) Anton & Hassan Electronics Pigi/? Test Beams Nicolas cooling Ian DCS ? Documentation Anton Gas Luigi Equipment DataBase ? Trigger Karol /Warsaw Covered Manpower needed Not covered
Action Items DPG • Run quality criteria definitions • Endcap efficiency studies (working point, muongraphy, HV scans) Run coordination • CAF organization (instruction update, DQM efficiency debug, WBM debut) • P5 Operation manager duties Technical coordination • CAEN board test setup at 904 (Hassan) • Distribution board production and plan (F. Loddo) RPC IB - Pigi Paolucci
Steering Committee • Task Force: Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino, Taejong) Endcap efficiency studies (D. Piccolo…….) • Goals definition at the first DPG meeting in Jan. • Be-weekly Report at PDG • Deadline (report) for March CMS week RPC IB - Pigi Paolucci
DPG Not covered tasks RPC IB - Pigi Paolucci
TC covered tasks RPC IB - Pigi Paolucci
2011 Manpower/ExpertResident at CERN (>40%) • Korea Univ: Taejong(70%), MeeHee Cho (50%), HyungChul Kim (30%) • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: • China: • Sofia Univ: Dimitrov • INRNE: Stoianov • Egypt: • Ghent:Costantini, Cimmino, Zaganidis, Phd • Napoli: Buontempo, Paolucci, Carrillo • LNF: Benussi, Piccolo • Uniandes: Ocampo, Gomez, Phd ? • Pakistan: Horani, Shahzad • Brussels: Van Doninck, Luc Van Lancker • Bari: Pugliese, Iaselli, Maggi, Colaleo, Calabria, Lusito, Tupputi RPC IB - Pigi Paolucci
2011 Manpower/Expert(not resident) • Korea Univ: • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: Vitulo • China: • Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk • INRNE: Stoianov, Genchev, Sultanov • Egypt: • Ghent:Tytgat • Napoli: Fabozzi • LNF: Bianco • Uniandes: • Pakistan: Horani, Shahzad, Saleh • Brussels: Luc Van Lancker • Bari: Abbrescia RPC IB - Pigi Paolucci
Conclusion • We have a lot to work to organize our project for the next two years of data tacking. • Steering committee has to help us in solving problems. • Planning and setting priorities is crucial. • New meeting organization • New organization chart RPC IB - Pigi Paolucci