An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC project organization 2011-2012 P. Paolucci

  2. RPC Institution Board • IB Rules are written in the CMS constitution • All the Institution leaders are member of the RPC IB • We meet at least 4 times (CMS week) • National representative can be invited ? Yes • Managers and experts can be invited to discuss special arguments • IB chairman will be vote in the March CMS week and he will follow all these aspects: • Meeting organization • Work very close to the PM • Special issue (papers, conferences……) RPC IB - Pigi Paolucci

  3. Introduction Steps toward the new RPC project organization • Today • Endorse RPC project organization chart • Endorse deputies PM • Endorse new RC • Endorse deputy RC and TC • Open call for the IB, EB, CC, Upgrade, Steering chairmen • January 19th • Deadline for chairmen nominations • Deadline for DPG, TC, RC & Upgrade LV3 coordinators • March CMS week • Vote chairmen • Endorse the full list of DPG, TC, RC & Upgrade coordinators RPC IB - Pigi Paolucci

  4. Conference Committee chairman Editorial board chairman Istitution Board chairman Resource manager P. Paolucci Project Manager P. Paolucci deputy/deputy Steering committee Tech. Coordination S. Buontempo deputy DPG D. Piccolo K. Bunkowski Run Coordinator G. Pugliese deputy Upgrade Resp. deputy RPC IB - Pigi Paolucci

  5. Resource manager (P. Paolucci) Project Manager (P. Paolucci) deputy/deputy Steering committee DPG D. Piccolo K. Bunkowski Run Coordinator G. Pugliese deputy Tech. Coordinator S. Buontempo deputy Maint & repar Resp. new Physic Valid Tool Resp. Online K. Bunkowski new Elect. Coord. Paolucci CAF Resp. new Offline D. Piccolo Gas Resp. P5 Resp. new Detector & trigger analysis C. Carillo Upgrade Resp. new …………. Resp. RPC IB - Pigi Paolucci

  6. 2011-2012 LV2 Positions to endorsetoday • Deputies Project Manager G. Pugliese (Bari) and M. Tytgat (Ghent) • Run Coordinator: L. Benussi (LNF) Deputy Run Coordinator: March 2011 • Tech. Coordinator: S. Buontempo (Napoli) Deputy Technical Coordinator: A. Dimitrov (Sofia) RPC IB - Pigi Paolucci

  7. DPG organization chart • New DPG organization chart (2011-2012) based on 4 correlated sectors: Online – Offline – Physic validation tools (new) – detector & trigger analysis (new) • We would like to endorse the chart today • Define and endorse all the responsibilities at the first 2011 DPG meeting • Korea interest in DQM (Korea Univ.) and Trigger analysis (SKK Univ.) • What about all the other people interested in participating to the RPC analysis ? RPC IB - Pigi Paolucci

  8. DPG (D. Piccolo) K. Bunkowski Run Coordinator (G. Pugliese) deputy Detector & trigger analysis Resp. Phys Valid Tool Resp. Offline Piccolo Online K. Bunkowski Local Reco C. Carrillo DQM Cimmino ConfigurationK. Bunkowski Detector perfomance Calabria SoftwareValidation/ Data Certification J. Gho Detector DB Trigger perfomance Resp. Run Quality Korea Simulation Pavlov Trigger DB M Szlepper Calibration Streams Maggi Noise tools Costantini DataBase DCS WBM Berzano Upgrade Simulation Skims Tupputi Covered RPC IB - Pigi Paolucci Manpower needed Not covered

  9. Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE,RE) Anton & Hassan Electronics Pigi/? Test Beams Nicolas cooling Ian DCS ? Documentation Anton Gas Luigi Equipment DataBase ? Trigger Karol /Warsaw Covered Manpower needed Not covered

  10. Action Items DPG • Run quality criteria definitions • Endcap efficiency studies (working point, muongraphy, HV scans) Run coordination • CAF organization (instruction update, DQM efficiency debug, WBM debut) • P5 Operation manager duties Technical coordination • CAEN board test setup at 904 (Hassan) • Distribution board production and plan (F. Loddo) RPC IB - Pigi Paolucci

  11. Steering Committee • Task Force: Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino, Taejong) Endcap efficiency studies (D. Piccolo…….) • Goals definition at the first DPG meeting in Jan. • Be-weekly Report at PDG • Deadline (report) for March CMS week RPC IB - Pigi Paolucci

  12. DPG Not covered tasks RPC IB - Pigi Paolucci

  13. TC covered tasks RPC IB - Pigi Paolucci

  14. 2011 Manpower/ExpertResident at CERN (>40%) • Korea Univ: Taejong(70%), MeeHee Cho (50%), HyungChul Kim (30%) • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: • China: • Sofia Univ: Dimitrov • INRNE: Stoianov • Egypt: • Ghent:Costantini, Cimmino, Zaganidis, Phd • Napoli: Buontempo, Paolucci, Carrillo • LNF: Benussi, Piccolo • Uniandes: Ocampo, Gomez, Phd ? • Pakistan: Horani, Shahzad • Brussels: Van Doninck, Luc Van Lancker • Bari: Pugliese, Iaselli, Maggi, Colaleo, Calabria, Lusito, Tupputi RPC IB - Pigi Paolucci

  15. 2011 Manpower/Expert(not resident) • Korea Univ: • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: Vitulo • China: • Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk • INRNE: Stoianov, Genchev, Sultanov • Egypt: • Ghent:Tytgat • Napoli: Fabozzi • LNF: Bianco • Uniandes: • Pakistan: Horani, Shahzad, Saleh • Brussels: Luc Van Lancker • Bari: Abbrescia RPC IB - Pigi Paolucci

  16. Conclusion • We have a lot to work to organize our project for the next two years of data tacking. • Steering committee has to help us in solving problems. • Planning and setting priorities is crucial. • New meeting organization • New organization chart RPC IB - Pigi Paolucci