1 / 6

RPC tasks and manpower 2011-2012

RPC tasks and manpower 2011-2012. P. Paolucci. DPG Not covered tasks. TC covered tasks. 2011 Manpower. Korea Univ : Taejong (70%) , Mee Hee Cho (50%) , Hyung Chul Kim (30%) SKK Univ : Chandigar : Mumbai BARC : Pavia: Vitulo China:

chico
Download Presentation

RPC tasks and manpower 2011-2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC tasks and manpower2011-2012 P. Paolucci

  2. DPG Not covered tasks RPC IB - Pigi Paolucci

  3. TC covered tasks RPC IB - Pigi Paolucci

  4. 2011 Manpower • Korea Univ: Taejong(70%), MeeHee Cho (50%), HyungChul Kim (30%) • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: Vitulo • China: • Sofia Univ: Litov, Dimitrov, Pavlov, Petkov, Hadjiisk • INRNE: Stoianov, Genchev, Sultanov • Egypt: • Ghent:Tytgat, Costantini, Cimmino, Zaganidis, Phd • Napoli: Buontempo, Paolucci, Carrillo, Fabozzi • LNF: Benussi, Piccolo, Bianco,Caponero, Felli, Saviano • Uniandes: Ocampo, Gomez (Phd new), Phd ? • Pakistan: Horani, Shahzad • Brussels: Van Doninck, Luc Van Lancker • Bari: Pugliese, Iaselli, Maggi, Colaleo, Calabria, Lusito, Abbrescia, Nuzzo RPC IB - Pigi Paolucci

  5. Steering Committee • I would like to introduce the concept of having a steering committee to solve, for ever, open questions and/or important issues. • Two Steering Committees proposed at RPC CW: Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino, Taejong) Endcap efficiency studies (D. Piccolo, A. Colaleo, M. Abbrescia, Hassan, C. Carrillo, C. Calabria) • Requirements and goals at the first DPG meeting in Jan. • Be-weekly Report at PDG • Deadline (report) for March CMS week RPC IB - Pigi Paolucci

  6. Conclusions Tasks • A tasks table, similar to the PDG table, will be provided by TC, RC and Upgrade as soon as possible. • We do have few important tasks not covered. I would like to ask the RPC Institution to make a big effort trying to cover all before end of January 2011 • I’ll present the final list at the next MB (Feb 2011) • I’ll ask CMS to look for new Institutions joining the RPC project (under discussion) Manpower • Many Institution already sent to me the list of people in the RPC (percentage), the one “resident” at CERN and their interests. • Pavia, Chandigar, BARC and SKK will be contacted asap RPC IB - Pigi Paolucci

More Related