MAVEN Particles and Fields CDR RFA Response Greg Dalton. MAVEN-PF-CDR-RFA-007. Title : Attenuator Life Test Reviewer: Gene Gochar Action: Please submit the Life Test Procedure for review. The procedure should include, but not limited to: Requirements
E N D
MAVEN • Particles and Fields CDR • RFA Response • Greg Dalton
MAVEN-PF-CDR-RFA-007 • Title : Attenuator Life Test • Reviewer: Gene Gochar • Action: • Please submit the Life Test Procedure for review. The procedure should include, but not limited to: • Requirements • • Test article preparations such as bakeout and vibration • • Test environments(should be the same as worst case Operational conditions and include electronics worst case conditions also) • • Definition of one cycle • • Facilities • • Etc. • Rationale: • This test is scheduled to begin in about one month and no supporting information was presented • Response: • See SWIA/STATIC Attenuator Assembly and Test Plan, MAV-STA-PRO-100
MAVEN-PF-CDR-RFA-008 • Title : Attenuator Verification Flow • Reviewer: Gene Gochar • Action: • Please submit the Verification Flow for the various Attenuator builds • Rationale: • This flow should stand alone and the information was not presented and needs to be documented • Response: • See SWIA/STATIC Attenuator Assembly and Test Plan, MAV-STA-PRO-100