LNGS Scanning Station Status

LNGS Scanning Station Status. Nicola D’Ambrosio (LNGS Group) Ankara, 2 April 2009. Scanning Station: General Status. Scanning activities Restarted (from 18/3) 6 Microscopes operative 8 within next week The new network Infrastructure tested and operative

lanza
Download Presentation

LNGS Scanning Station Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LNGS Scanning Station Status Nicola D’Ambrosio (LNGS Group) Ankara, 2 April 2009

  2. Scanning Station: General Status • Scanning activities Restarted (from 18/3) • 6 Microscopes operative 8 within next week • The new network Infrastructure tested and operative • More powerfull critical machines: • FileServer, DataServer , domain server and Storage • Array (Oracle database and Raw Data) • New 9 TB storage disk array (RAID 5) • New 4 processing machines ( 8 core , 8GB ram per PC) for a total of 7 dedicated machines for High Fog Scanning (Other additional 3 can be used )

  3. Scanning Station: new network and machine infrastructure Scanning Station net (172.17.12.x) 13 Microscope’s PC 2 Domain Servers 10 Processing machine LNGS net Router Firewall Gigabit Switch 5 data server machine 2 Storage disk array (12 TB)

  4. Scanning Station: Lyon Microscope 3 New Microscopes mounted and checked (hardware) Next week: cabling, software installation and first functional measurements If everything proceed properly Ready within the end of April

  5. existing 8 LNGS microscopes moved in their final position

  6. Scanning station scanning capability • Input for the calculation: • Microscopes: 11 • 24 hour/microscope • Nominal speed • contingency and dead time • Scanning station capability: ~ 2300 cm2/day • Taking in account last exstimation presently we need : • ~ 140 cm2/event (10% zone superposition), to be compared with 50 cm2 foreseen for the scanning of the first brick (See Luillo talk…) • We should take into account a speed reduction of about 75% due to the lowered threshold in the image processing .This could be compensate with: • a wider usage of ScanGrid: more tracking servers • different efficiency optimization • Software improvement

  7. About 75% shifts covered ( 2009 < 40% )