Testing of Cap-Cav 2 LLRF Development with DESY

Testing of Cap-Cav 2 LLRF Development with DESY. Alexander Brandt, DESY, Hamburg Current and Future LLRF Developments at DESY DESY Low Latency Control Hardware Collaboration with FNAL-A0, –SMTF and –HPTF (present and future). DESY LLRF Contributors.

lars-sutton
Download Presentation

Testing of Cap-Cav 2 LLRF Development with DESY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Testing of Cap-Cav 2LLRF Development with DESY Alexander Brandt, DESY, Hamburg Current and Future LLRF Developments at DESY DESY Low Latency Control Hardware Collaboration with FNAL-A0, –SMTF and –HPTF (present and future)

  2. DESY LLRF Contributors • DESY, Hamburg, Valeri Ayvazyan, Alexander Brandt, Gerhard Grygiel, Thomas Fröhlich, Olaf Hensler, Matthias Hoffmann, Bastian Lorbeer, Frank Ludwig, Günther Möller, Kay Rehlich, Stefan Simrock, Henning Weddig, ... • WUT-ISE, Warsaw, Tomasz Czarski, Krzystof Czuba, Tomasz Filipek, Wojciech Giergusiewicz, Wojciech Jalmuzna, Pawel Kaleta, Waldemar Koprek, Karol Perkuszewski, Piotr Pucyk, Ryszard Romaniuk, Jaroslaw Szewinski, ... • TUL-DMCS, Lodz, Wojciech Cichalewski, Piotr Cieciura, Mariusz Grecki, Tomasz Jezynski, Boguslaw Koseda, Dariusz Markowski, Pawel Pawlik, Przemsylaw Sekalski, Bartlomiej Swiercz, Marcin Wojtowski, ... • IHEP, Protvino, Nikolay Ignashin, Sergej Sytov, ... • INFN, Milano, Angelo Bosotti, Rocco Paparella • KEK, Japan, Shin Michizono, Toshi Matsumoto • Yerewan Institute, Gevorg Petrosyan, Ludwig Petrosyan • ...

  3. LLRF Developments at DESY: VUV-FEL • Running since 2004 (as successor of TTF1, 1997-2003) • SC linear injector, 6 undulator sections (down to 6nm wavelength) • Pulsed operation (2ms / 1-10Hz) • 1 nc cathode, 48 sc cavities, 1 transverse deflecting cavity • 5 rf stations (one klystron per 8-32 sc cavities) • Field stability requirement: 10-3 / 0.1° • Designed as user facility and for accelerator development • Ideal testbed for LLRF developments! VUV-FEL

  4. LLRF Developments at DESY: VUV-FEL

  5. LLRF Developments at DESY: XFEL, ILC • FEL lightsource for sub-nm wavelength, commissioning ~2012 at DESY • ~1000 cavities, 35 klystrons • High field stability: 10-4, 0.01° • User facility (high reliability) • Demands for a low-maintenance, radiation resistive hardware XFEL ILC • Future project, not yet scheduled (2012-2020?) • ~20000 cavities • Collider experiment, therefore relaxed field requirements • Very high degree of automation needed (e.g. global phase control, recovery automation)

  6. Vecor Sum Control Challenges VM ... (32) 1.3 DAC DSP ADC • Latency in control loop limits feedback gain (and therefore field stability) •  build faster feedback hardware (Current revision: SimCon 3.1 FPGA system, ~200ns) • Mechanical / electrical detuning limits performance and increases power demand •  build fast resonance frequency control system (piezo or magnetostrictive tuning) • Calibration of signals determines precision (nonlinear effects) •  build transient detection hardware • Reference and Distribution determines field stability •  build long range temperature stable reference system

  7. Further Projects 8-channel downconverter boards (already in operation) Bubble Neutron Dosimetry system w/ automatic readout s/w Piezoelectric tuner installed at one cavity Transient detection hardware (test setup) Box equipped with several field detectors for the rf gun

  8. DESY's Low Latency Control Boards • DSP C-67 • Successor of C-40 • (1997-2003) • TI C-67 CPU • In Operation for VS control since 2004 • 8 Gigalink channels • No ADCs/DACs on board • ~3us • SimCon 2.1 • 2004 • 2xADCs, 2xDACs • Virtex II FPGA • Successfully tested at DESY 9-cell teststand (single cavity) • Successfully tested at A0 • Optical Gigalink 2.0GB/s mezzanine card • Measured latency: 200ns+160ns! • SimCon 3.0 • 2004 • 8xADCs, 4xDACs • Virtex II FPGA • Successfully tested at DESY 9-cell teststand • Vectorsum Test at VUV-FEL scheduled for May/June • Optical Gigalink on board (3.125GB/s) • Measured latency: 200ns+160ns! • SimCon 3.1 • 10xADCs, 4xDACs • Virtex II Pro FPGA with 2 PPC405 • 2x Optical Gigalink • Schematics finished • Prototypes expected in July • SimCon x.x • 128xADCs, 64xDACs • Allows complex control algorithm • Account for additional signals C-67 DSP Board: SimCon3.1 Block Diagram: SimCon3.0 Board: SimCon2.1 Board:

  9. LLRF Plans for A0/SMTF (Present / Short Term) • Refer to Brian Chase talk • What we have done already • Commision SimCon 2.1 prototype (1 week in March 05) at A0 • Achieved high gain (~100) already • Cleaned up DOOCS control system at A0 • What we plan (short term, May '05 until end '05) • Again set up SimCon 2.1 at A0 • Improve calibration of system • Test various algorithms • Establish remote connection DESY  FNAL • Update DOOCS control system at FNAL • DESY support by G. Grygiel, O. Hensler, K. Rehlich • DOOCS has interface to other systems, e.g. EPICS

  10. Tests in March '05 Readout Panel: Top: I and Q (blue) resp. Amplitude and Phase (red) of the Cavity Bottom: I and Q setpoint curves Matlab Control Panel: Feedback Gain in the order of 100

  11. LLRF Plans for A0/SMTF (Medium / Long Term) • Refer to Brian Chase talk • What we plan (medium term, starting from end '05) • Continue support on the DOOCS control system at FNAL • Provide further SimCon systems (SimCon 3.1 to arrive by the end of this year) • Provide signal detection hardware (downconverters) • Collaboration with FNAL-staff on algorithm development • What we plan (long term) • Provide and support further SimCon systems • Continue support on the DOOCS control system at FNAL

  12. Summary and Outlook • Based on the successful experience of TTF1 (first machine with VS control) and VUV-FEL, DESY is currently in the process of developing the LLRF control for XFEL • Development of LLRF control for XFEL already accounts for the requirements of ILC (automation, radiation hardness) • Demonstrated single cavity control at A0 in March '05 • Established collaboration with FNAL for FPGA software development • Plan to equip SMTF with next revisions of SimCon • As a universal digital control system SimCon is applicable to many accelerators (in principle it is not restricted to LLRF control only)