An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southwest Power PoolTechnical Workshop RTO_SS SPP’s RTO Electronic Scheduling System

  2. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  3. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  4. Overview and Current Status • Status as of March 7, 2001 • WebData to be Installed at SPP, March 14, 2001 • SPP Acceptance Testing Begins, March 19, 2001 • Unstructured User Testing Begins, April 9, 2001 • SPP User Training Sessions, April 11, 12, 2001 • RTO_SS Operational, May 1, 2001

  5. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  6. Data Exchange • Instantaneous Net Schedule • Calculated Once Per Minute • Includes all Schedules via NERC Tags • Includes ARS Assistance Schedules • Includes Ramp Calculations • Includes Loss Payback Schedules

  7. Data Exchange • Instantaneous Net Schedule • Distributed to Control Areas via ICCP • Every Minute ? • By Exception ? • Discuss with Tech. Group • Viewable on RTO_SS GUI

  8. Data Exchange • Net Schedule Interchange File • Configurable from current hour to next two hours • Breakdown by Minute • XML Format • Discuss methods for sending to members • HTTP Transfer to ARS with listener • HTTP Transfer to Member web listener • FTP Access Method

  9. Data Exchange • OATI’s webData Product at SPP • Contains all schedule data locally to SPP • SPP Methods for Exporting sched data • OPS1 Web Access for Viewing/Download • Automated Procedures by SPP Staff based on User Needs • ODBC Backend Connectivity

  10. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  11. Contingency Plans • System Redundancy • Redundancy at OATI • Redundancy at SPP • ICCP Redundancy • Redundant Communication Access

  12. Contingency Plans • What if ICCP link is down? • Data is still viewable from GUI • Other suggestions? • What if SPPNET is down? • Access RTO_SS via the Internet • What if OATI has major failure? • What if SPP has major failure? • Any other major points of failure?

  13. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  14. User Training Plans • SPP will work with OATI to accomplish User Training • Sessions TENTATIVELY scheduled for April 11 and April 12. • SPP will hold 2 separate sessions, with each being one day in duration • Locations to be announced

  15. Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions

  16. Contacts at SPP: 501-664-0146 Barbara Gibson ext. 245 Aaron Ralls ext. 279 Kevin Perry ext. 251 www.spp.org