180 likes | 385 Views
Resolution Tracking System. Resolution Tracking System. Objectives Background Overview of Business Processes Define EOR/Design Firm Representatives Role. Resolution Tracking System. As mandated by Procedure No. 375-020-010; “The Project Management, Research & Development
E N D
Resolution Tracking System Objectives • Background • Overview of Business Processes • Define EOR/Design Firm Representatives Role
Resolution Tracking System As mandated by Procedure No. 375-020-010; “The Project Management, Research & Development Office and the Office of Information Systems shall establish and maintain a Web-based tracking system to monitor the Errors and Omissions resolution process.”
Resolution Tracking System The Resolution Tracking System (RTS) was developed to provide a tool to assist with the documentation and tracking of consultant responsibility for E&O issues in construction plans and contract documents.
Resolution Tracking System The principal users of this application: • Construction Engineering and Inspection (CEI) Personnel • Design Project Manager (DPM) • Errors and Omissions Liaison • Construction Project Manager (CPM) • District Consultant Project Management Engineer (DCPME) • District Design Engineer (DDE) • District Construction Engineer (DCE) • District Directors (Transportation Development & Operations) • General Counsel (District and Central Office) • Office of Comptroller-General Accounting Office (OOC-GAO).
Resolution Tracking System Business Processes • Issues Participants • Issue Discovery • Early Notification • Construction Engineer Assessment • Design Project Manager Assessment • Internal Resolution • Contract Modification
Resolution Tracking System Business Processes (cont’d) • E&O Notification Letter • CEC Evaluation • First Demand Letter • CCRC Evaluation • Office of General Counsel • Second Demand Letter • Final Resolution
Resolution Tracking System Issue Participants Process • CEI personnel will e-mail the EOR, if he is not already registered in the RTS database, requesting that he register in the database
Resolution Tracking System Issue Discovery Process • CEI personnel notifies the EOR via e-mail that an issue has been identified that needs his immediate attention • EOR enters a response in RTS acknowledging that he is aware of the issue and is working with CEI personnel to resolve it
Resolution Tracking System Sample Notification Resolution Tracking System Send To: eor.name@firm.com, cei.name@dot.state.fl.us, pm.name@dot.state.fl.us Subject: Action: A new project issue has been entered into the Resolution Tracking System from the Florida Department of Transportation. Message: A new project issue has been entered into the Resolution Tracking System from the Florida Department of Transportation. This project issue needs your immediate attention. As a EOR/Design Firm Representative and a representative from your office, you may enter a vendor response directly into the system. Also, please note that while the issue is "Open under CEI review", the CEI Personnel/Construction Representative may modify the project issue. The DPM/FDOT Design Representative, EOR/Design Firm Representative and other participants may enter a comment or send an email link to update this project issue. Please contact the appropriate CEI personnel to resolve/clarify this issue. The issue information and contact details are listed below.
Resolution Tracking System (cont’d) Issue Number: 2008-000XXX. Construction Contract: T5abc. Description: SR XX (US YY) - Add. CEI Name: CEI Name CEI / Construction Representative eMail: cei.name@dot.state.fl.us. CEI / Construction Representative Phone: 123-456-7890.Click here to access the Resolution Tracking Document. You will be required to logon using your FDOT User ID and your Lotus Notes password. Note*:Your message will be sent including a link to this E & O document. The link will only be accessible to a valid E & O system user.
Resolution Tracking System Early Notification Process • DPM generates and sends a letter to the EOR notifying him that an issue requiring his attention has been identified • EOR responds in writing to acknowledge that he is aware of the issue and he is working with CEI personnel to resolve it
Resolution Tracking System E&O Notification Letter Process • The DPM generates and sends the E&O Notification Letter to the appropriate design firm representative • The design firm representative responds stating firms position on the details of the issue
Resolution Tracking System In Summary … • RTS is a tracking system • Not intended to replace/change current business practices • EOR/design firm representative is an active participant in the process
Resolution Tracking System Comments ? Questions ?
Resolution Tracking System State Project Management Office; http://www.dot.state.fl.us/projectmanagementoffice/erroromissions/ default.htm Resolution Tracking System (RTS) registration page; https://lnfdotx.dot.state.fl.us/eo/resolution/registration.nsf/?Open RTS login page; https://lnfdotx.dot.state.fl.us/eo/resolution/resolutionmain.nsf/?Open
Resolution Tracking System george.borchik@dot.state.fl.us 386-943-5163