An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Intermodal System Funding Strategy District Two May 9, 2013

  2. Strategic Intermodal System Funding Strategy 2nd Five 2019-2023 Long Range Cost Feasible Plan 2024-2040

  3. Building the SIS Plan: A Partnership

  4. First Coast Outer Beltway NFTPO No. 1 on SHS list. Locally Preferred Alternative shown

  5. 301 95 95 295 10 First Coast Outer Beltway $1,380,000

  6. I-95 Corridor 301 95 95 295 10 $42,837 $79,258

  7. I-95 Corridor 301 95 95 295 10 $15,200

  8. I-95 Corridor 301 95 95 95 95 295 10 10 $70,000 in 2nd Five

  9. I-95 Corridor 95 95 95 295 10 $55,000

  10. I-95 Corridor 301 95 95 295 10

  11. 17 95 95 295 WP Project No. 213323-1 I-95/I-295 North Interchange FYPhase Amount 2015 RW $ 7,000,000 2016CST $130,000,000

  12. I-95 Corridor 301 95 95 295 10 $15,000

  13. I-10 Corridor 301 95 95 295 10 $41,058 $45,367 $ 5,068 $64,209 $79,258 $234,960

  14. 301 95 95 295 10 $58,503,000 in 2nd Five Years

  15. I-295 $82,864 $16,148 $62,719 $168,279 $70,392 $33,000

  16. I-295 WP Project No. 209658-4 I-295 (SR 9A) from I-95 to Dames Point Bridge FY Phase Amount 2014 ROW $ 4,013,000 2014 ENV $ 3,225,000 2017 CST $123,670,000 209658-4 Add lanes and Reconstruct 209301-4 Add lanes and Reconstruct Construction now funded in CF WP Project No. 209301-4 I-295 (SR 9A) Dames Point Bridge to SR 202 JTB FY Phase Amount Design underway $165,411 209301-3 Add lanes and Reconstruct WP Project No. 209301-3 I-295 (SR 9A) from SR 9B to JTB FY Phase Amount 2015 RRU $ 3,250,000 2015 CST $29,366,000

  17. Strategic Intermodal System Funding Strategy Long Range Cost Feasible Plan 2024-2040 $1,288,200,000 Transportation has a tremendous Economic impact

  18. Florida Department of Transportation THANK YOU! James G. Bennett, P.E. Urban Transportation Development Manager (904) 360-5646 James.Bennett@dot.state.fl.us