10 likes | 93 Views
Control Number: 0923-1636. Cooperative Sun Doug Carter, Project Manager . Total Project Cost $625,00 DOE Funding $500,000 Cost Share $125,000 Duration Months: 6-9 months . Tax Equity . Cooperative Sun. Coop. Net Metered Coop Members. Loan: RUS , FFB, CFC, etc.
E N D
Control Number: 0923-1636 Cooperative Sun Doug Carter, Project Manager Total Project Cost $625,00 DOE Funding $500,000 Cost Share $125,000 Duration Months: 6-9 months Tax Equity Cooperative Sun Coop Net Metered Coop Members Loan: RUS, FFB, CFC, etc. Project SPE (Flip, Lease or Inverted Lease) Ownership Rights