Raw Data Flows. Archival Backend KEK Datastore won’t be ready until March 2009 Stopgap will be KEK neutrino group RAID array – inconvenient for UK Solution: UK Grid Storage Element Lancaster DPM fal-pygrid-30.lancs.ac.uk:8446
E N D
Raw Data Flows ... • Archival Backend • KEK Datastore won’t be ready until March 2009 • Stopgap will be KEK neutrino group RAID array – inconvenient for UK • Solution: UK Grid Storage Element • Lancaster DPM fal-pygrid-30.lancs.ac.uk:8446 • Archive to: /home/t2k/raw/DsEcalCosmics/run_range (e.g. 0005000_00059000) • Recent Archiver extension • Support for GIRD Storage Elements • Have tested access to Lancaster using gLite lcg-utils • Requires GRID proxy that must renewed every few days (max lifetime is 1 week) • Preview Copier • Not an assured service (but should only fail in exceptional circumstances) • Make a copy within ISIS Hall to offline machine. T2KUK Meeting Liverpool
... Raw Data Flows ... Restricted Access (limited to immediate DAQ operational needs) Lancaster DPM SE fal-pygrid-30.lancs.ac.uk:8446 Lancaster WAN ISIS Hall Archive copy Offline disk Preview copy General Access (requires GRID certificate, but not VOMS extension) RAL WAN Archiver DAQ disk 100MBit/sec Limited connectivity to ISIS Hall Internal preview copy for DAQ operation External copy at Lancaster Both copies should be available in ~ 10 minutes of file closing T2KUK Meeting Liverpool
... Raw Data Flows • Data Rates • Melissa: estimate 10GB/week. Assume a very large error particularly for early running and assume 100GB/week • Have a 4 week buffer (for extended network/SE problems): so require 400GB DAQ disk • Access to Lancaster SE • Renee has reported problems • Have yet to get details • Does not require VOMS extension • Which is good as they have very limited lifetime and would require setting up a proxy server to renew. T2KUK Meeting Liverpool