Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994. Technical Kick off meeting Grosuplje September 22-23 2008. Integration Preparation António Cunha – Pedro Nunes Institute cunha@ipn.pt www.las.ipn.pt.

Download Presentation

Technical Kick off meeting Grosuplje September 22-23 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative AlliancesGrant Agreement: 223994 Technical Kick off meetingGrosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute cunha@ipn.pt www.las.ipn.pt

  2. What we want to have in May 2011? www.n4c.eu

  3. Please: • Imagine that we are in 2011 • Forget the details... • Imagine a unic platform that should fullfil all the requirements www.n4c.eu

  4. To start the integration process we need: Integration workplan System Requirements Development and tests SystemSpecification (Sysml ?) + + + www.n4c.eu

  5. Agenda Phase 1 (2 minutes): Sysml overview (idb block) Phase 2 (20 minutes): Identify the system main modules and the communication protocols. Phase deliverable: N4C global diagram (Sysml) Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module Phase deliverable: “n” Sysml diagrams (one per module), with inputs and outputs (draft) Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other Phase deliverable: Integration workplan Phase 5 (“optional”): Identify the system requirements Phase deliverable: System requirements list www.n4c.eu

  6. Phase 1: Sysml overview (idb block) Time: 2 minutes www.n4c.eu

  7. Phase 2: Identify the system main modules and the communication protocols. Time: 20 minutes Deliverable: N4C global diagram (Sysml) www.n4c.eu

  8. Phase 3: Identify the main functions and the inputs and outputs of each module • Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs www.n4c.eu

  9. Phase 4: Identify the expected time for each module development and the dependences between each other Time: 15 minutes Deliverable: Integration workplan www.n4c.eu

  10. Phase 5 (optional): Identify the system requirements Time: -- minutes Deliverable: System requirements Checklist www.n4c.eu

  11. END/FIM N4C speaker: António Cunha Speakers organisation: Pedro Nunes Institute Speakers e-mail address: cunha@ipn.pt Speakers web page: www.las.ipn.pt