Transit Gas Pipeline EuRoPol GAZ s.a. The Yamal - Europe Transit Gas Pipeline section on the territory of Poland. Key elements. General description of the system Viability assessment of the Polish section of the Yamal-Europe Pipeline. EuRoPol Gaz m ai n events.
E N D
Transit Gas Pipeline EuRoPol GAZ s.a. The Yamal - Europe Transit Gas Pipeline section on the territory of Poland
Key elements • General description of the system • Viability assessment of the Polish section of the Yamal-Europe Pipeline
EuRoPol Gaz main events • 1993, EuRoPol Gaz S.A. foundation • 1994, the European Union priority project • 1998, beginning of construction • 2000, the system partly in operation • 2005, the first pipeline reached the target capacity
Rosja Litwa Gdansk morze Ba3tyckie rz. Wis3a rz.Skrwa ENTRY Białystok Kondratki Szczecin Zambrów Ciechanów rz. Odra EXIT Białoruś 2 km Niemcy Włocławek 128 km rz.Narew rz. Warta 244 km Ruś Stara EXIT Szamotuły 368 km EXIT Górzyca rz.Bug Berlin 545 km Lwówek Warszawa Брест Poznań rz. Notec Wsch. Frankfurt Czechy Wrocłwaw rz.Bug Praha Kraków Ukraina Lwów Słowacja General description of the section
Technical Parameters • Total length of the Pipeline - 685 km • Pipeline Diameter of pipe: 1420 mm • Maximum operating pressure: 8.4 MPa • 5 Compressor Stations • Total installed power of 5 compressor stations: 600 MW • Total capacity of the existing first line: 32.3 billion cubic meters per year