30 likes | 150 Views
Closing Report. Authors:. Date: 2010-09-17. Abstract. Closing report for WNG SC for September 2010, Waikoloa, Hawaii, Hawai’i, USA. Presentations at September 2010 meeting Smart Grid and Key Lengths (11-10-0964-00-0wng-smart-grid-key-lengths.pptx) – Dave Halasz
E N D
Closing Report Authors: Date: 2010-09-17 Clint Chaplin, Chair (Samsung)
Abstract Closing report for WNG SC for September 2010, Waikoloa, Hawaii, Hawai’i, USA Clint Chaplin, Chair (Samsung)
Presentations at September 2010 meeting • Smart Grid and Key Lengths (11-10-0964-00-0wng-smart-grid-key-lengths.pptx) – Dave Halasz • 'L-Cubed': LONGER Range, LOWER Data rate, LOW Energy Wi-Fi Opportunity (11-10-1120-00-0wng-l-cubed-longer-range-lower-data-rate-low-energy.pptx) – Bill Carney • Minutes • 11-10-1138r0 • Plans for November 2010 • 1 2 hour session Clint Chaplin, Chair (Samsung)