60 likes | 193 Views
ARC Closing Report . Authors:. Date: 2014-03-19. Abstract. This document is the closing report for ARC SC, March 2014 , Beijing meeting. Work Completed. Presentation: OmniRAN overview https:// mentor.ieee.org/802.11/dcn/14/11-14-0398-00-0arc-wg-cooperation-for-omniran-p802-1cf.pptx
E N D
ARC Closing Report Authors: Date:2014-03-19 Mark Hamilton, Spectralink, Corp.
Abstract This document is the closing report for ARC SC, March 2014, Beijingmeeting Mark Hamilton, Spectralink, Corp.
Work Completed • Presentation: OmniRAN overview • https://mentor.ieee.org/802.11/dcn/14/11-14-0398-00-0arc-wg-cooperation-for-omniran-p802-1cf.pptx • Request for 802.11 SME review and comment • IETF/802 coordination update – Dorothy Stanley • CAPWAP: • New work item proposal (into IETF) for “Alternative Data Tunnel” – drafted liaison response that this appears out of scope of 802.11 • Other drafts not ready yet - will consider 802.11 comment collection process, when drafts available • RFC4441: • Noted rev8 available. No action needed. • PAWS: • Draft 8 available, 802.11 held comment collection – no comments • Update on 802 O&A D1.8 • Latest Sponsor Ballot recirc closed Mar 14, in comment resolution • Expect next Sponsor Ballot recirc shortly after Mar meeting Mark Hamilton, Spectralink, Corp.
Work Completed (con’t) • IEEE 1588 mapping to 802.11 • IEEE 1588 and 802.1AS experts working together to create layered architecture, which will preserve 802.1AS mapping to 802.11. • No further work needed now, will continue to monitor • 802.1AC revision • Task Group ballot closed Mar 14, in comment resolution • Will continue to work with 802.1 IWG and TGak on topics in common • Architecture of APs/DS/Portals, and 802.1 concepts • Reviewed tutorial animation submission (https://mentor.ieee.org/802.11/dcn/14/11-14-0097-00-0arc-dual-band-ap-tutorial-simulation.zip) • Will provide comments to author, additional off-line comments encouraged Mark Hamilton, Spectralink, Corp.
Teleconference(s) • One expected, scheduled with 10 days notice: • Discuss comments collected on 802 O&A recirc • Expect week of Mar 31 • Need for other telecons is possible: • If CAPWAP drafts become available • If 802.1AC Task Group ballot recirc starts Mark Hamilton, Spectralink, Corp.
May 2014 Goals • One meeting slot planned: • Architecture topics: AP/DS/Portal • 802.1AC balloting • 802 O&A sponsor ballot • IETF/802: RFC 4441, CAPWAP, PAWS • IEEE 1588, if needed. Mark Hamilton, Spectralink, Corp.