1 / 5

802.16m Closing Report

802.16m Closing Report. September 16, 2010 St. Petersburg, Russia Session #69. 802.16m Closing Report – St.Petersburg. Into Session #69: SB 2nd recirculation: 86% return rate ; 67% approval SB Comments to be resolved at Session #69 on D8 Amendment Text ( 802.16-10/0047r1 )

Download Presentation

802.16m Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.16m Closing Report September 16, 2010 St. Petersburg, Russia Session #69 IEEE 802.16m-10/0030r1

  2. 802.16m Closing Report – St.Petersburg • Into Session #69: • SB 2nd recirculation: 86% return rate; 67% approval • SB Comments to be resolved at Session #69 on D8 Amendment Text (802.16-10/0047r1) • 391 non-editorial: 64 editorial; 11 general • 246 MAC (1 Maintenance) • 47 PHY • 7 General • 91 Other • 117 editorial comments • Several hundred reply comments • 176 contributions • 93 MAC • 39 PHY • 4 Femto/SON • 0 Multi-BS MIMO • 6 Relay • 3 LBS • 3 e-MBS • 28 Other IEEE 802.16m-10/0030r1

  3. 802.16m Closing Report- St. Petersburg • Plan for the week: • Resolve ALL Sponsor Ballot comments (ONLY focus) – Done!! • Resolved :457 • Editorial: 59 • Technical: 387 • General: 11 • Agreed: 169 • Principle:159 • Disagree: 129 • Contributions to adopt:101 IEEE 802.16m-10/0030r1

  4. 802.16m Closing Report- St Petersburg • Primary comment resolution groups on PHY and MAC during daytime hours • Scheduled evening sessions (Mon/Tues) for harmonization and comment resolution as needed. Also see final TGm Agenda, 802.16m-10/0029r1 • Accepted comment resolution database (802.16m-10/0047r3) and authorized Editor to create D9 • Request WG to request SB recirc #3 (see following motions) • Discussed WorkPlan and schedule: • Decided to Have a single recirc between now and next meeting in November (no BRC) – current workplan to be updated • Draft D9 to include updated ASN.1 code as an informative annex • Recirc entire document • 2 week long reply comment cycle • Constructed liaison to IETF for Security Review of D9 • Drafted liaison to MEF in response to their correspondence IEEE 802.16m-10/0030r1

  5. 802.16m Closing Report- St. Petersburg • Motions to WG: • To approve the Session #69 resolutions to comments contained in 802.16-10/0047r3, and to authorize the editor to create a new draft P802.16m/D9 • To request the WG chair to initiate a recirculation SB on draft P802.16m/D9 in which the entire document is open for comment. IEEE 802.16m-10/0030r1

More Related