PETROTECH-CO. Offshore Introduction. Layout Guide. SAGADRIL-2 HELIDECK DURING SIMOPS. SPD3 PRODUCTION PLATFORM & SAGADRIL-2 DRILLING RIG. SAGADRIL-2 (JACK-UP). SPD3 (JACKET). HELIDECK / UPPER DECK. MEZZANINE DECK. LOWER DECK. SUMP DECK. JACKET DECK. BSP1. WELCOME TO THE RIG !.
E N D
PETROTECH-CO Offshore Introduction Layout Guide
SPD3 PRODUCTION PLATFORM & SAGADRIL-2 DRILLING RIG SAGADRIL-2 (JACK-UP) SPD3 (JACKET) HELIDECK / UPPER DECK MEZZANINE DECK LOWER DECK SUMP DECK JACKET DECK BSP1
ESD BUTTON SPD3 HELIDECK VIEW F/ SAGADRIL- 2
SGD-2 CANTILEVER OUT STAIRWAY BETWEEN SPD3 & SGD-2
21”1/4 BOP STACK ON STUMP SGD-2 BOP DECK 18”5/8 BOP STACK ON SPD3 -10 WELL
UPPER PACK CANTILEVER LOWER PACK
FLARE BRIDGE
SPD4 / SGD-1 FLARE LINE EXPANSION LOOP RP1 PLATFORM BSP1 PLATFORM
ACCOMMODATION ROOM ( 2 x2 BEDS )
X-MAS TREE BAY AREA 13”5/8 DRILLING RISER (SIMOPS ON SPD3-10) 8” FLOWLINE GAS+WATER+CONDENSATE TO CHOKE VALVE HYDRAULIC PRODUCTION WING VALVE MANUAL SWAB VALVE X-MAS TREE (SPD3-07) MANUAL WING VALVE HYDRAULIC MASTER VALVE MANUAL MASTER VALVE
X-MAS TREE BAY AREA FLOWLINE X-MAS TREE CAP
FLOWLINE DETAILS GAS+WATER+CONDENSATE TO CHOKE VALVE METHANOL INJECTION + DHSV EQUALIZING LINE PRESSURE GAUGE PRESSURE SWITCH CHOKE VALVE
METHANOL INJECTION SYSTEM METHANOL DRUM (5m³) TRIPLEX PUMP
CHOKE VALVE 8” FLOWLINE GAS+WATER+CONDENSATE F/WELLHEAD METHANOL INJECTION LINE CHOKE VALVE TO ISOLATION VALVE
GAS+WATER+CONDENSATE F/WELLHEAD CHOKE VALVE ACTUATOR CHOKE VALVE ALIGNMENT (F/BEHIND)
TO ISOLATION VALVE TO PSV F/ CHOKE
TO PSV ISOLATION VALVE WELLHEAD PRESSURE TRANSMITTER WELLHEAD TEMPERATURE TRANSMITTER TO PRODUCTION & TEST MANIFOLDS (LOWER DECK) F/ CHOKE VALVE ISOLATION VALVE ALIGNMENT
PSV ALIGNMENT TO HP RELIEF HEADER & KO DRUM P.S.V. (PRESSURE SAFETY VALVE) CORROSION COUPON TO PSV FLOWLINE TO ISOLATION VALVE
TO HP RELIEF HEADER & KO DRUM P.S.V. (PRESSURE SAFETY VALVE) PSV ALIGNMENT
HP RELIEF HEADER TO HP RELIEF KO DRUM 24” HP RELIEF HEADER
F/ CHOKE VALVE ISOLATION VALVE TO PRODUCTION & TEST MANIFOLDS (LOWER DECK) ISOLATION VALVE ALIGNMENT
F/ CHOKE VALVE ISOLATION VALVE TO PRODUCTION & TEST MANIFOLDS (LOWER DECK) ISOLATION VALVE ALIGNMENT
WELLHEAD CONTROL PANEL FLOWLINE PRESSURE SWITCH INDICATORS X-MAS TREE VALVE ACTUATOR PRESSURE GAUGES ESD 2 ESD 1 EMERGENCY SHUT-DOWN PUSH/PULL BUTTONS DHSV MV WV X-MAS TREE VALVES COMMAND (PUSH/PULL BUTTON)
WELLHEAD CONTROL PANEL FUSIBLE LOOP (FIRE PROTECTION) FUSIBLE LOOP STATUS
ALARMS P.A.G.A* SPEAKER HP RELIEF HEADER TO HP RELIEF KO DRUM GAS WARNING LIGHT FIRE WARNING LIGHT P.A.G.A* : PUBLIC ANNOUNCEMENT & GENERAL ALARM
24” PRODUCTION LINE F/ PRODUCTION MANIFOLD (24”) TO SEALINE
F/ PRODUCTION MANIFOLD (24”) TO FWKO* TO SEALINE TO PIG LAUNCHER 12” KICKING LINE FWKO* : Free Water Knock-Out ( Tie-in for future FWKO)
PIG LAUNCHER DOOR TO PIG LAUNCHER KICKING LINE
F/ PRODUCTION MANIFOLD TO SEALINE BLEED-OFF VALVE (8”) F/ TEST SEPARATOR (8”) 24” PRODUCTION LINE TO SEALINE N2 INERTING LINE TO PIG LAUNCHER KICKING LINE
F/ TEST SEPARATOR (8”) FUTUREFWKO INLET TO SEALINE BLEED-OFF VALVE (8”) FUTUREFWKO OUTLET 12” MOV* TO SEALINE 12” MOV* 12” KICKING LINE TO PIG LAUNCHER SPOOL REMOVED (BLIND FLANGE) AFTER FWKO INSTALLATION MOV*: MOTORISED OPERATED VALVE
PRESSURE TRANSMITTER 24” PRODUCTION LINE MEG INJECTION LINE PRESSURE TRANSMITTER VALVE KICKING LINE
24” MOV MEG INJECTION LINE TO SEALINE (LOWER DECK) METHANOL DRUM VENT(TO SAFE LOCATION)