US 14 Expansion Nicollet to North Mankato. Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes. 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes. US 14 – Recent History. Immediate Actions. Enforcement
E N D
US 14 Expansion Nicollet to North Mankato Zachary Tess D7 Project Manager
US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes
Immediate Actions • Enforcement • Relocation of existing HEAT zone • Additional four hours of presence each day • Up from two hours per day • Funding through September of 2012 • $62k per year to maintain additional presence • Signing • Additional signing to address motorist behavior
Interim Safety Project $2.5M Construction Cost
Constrained vs. Corridor Typical Constrained
Why are Construction Costs Higher in Constrained?!? • Additional Pavement & Aggregate needs • 14’ inside median vs. 4’ shoulder • Loonheads – U-turns for truck/agg equipment • Crown correction–cheaper than drainage structures • Still need R/W (south side utility poles)
R/W cost and Constrained Viability • Current R/W Costs - $12K/acre • Provided by District Real Estate Rep • When Construction + R/W becomes equal between alternatives • $46K/acre – Assumes HTCB in both alternatives • $66K/acre – HTCB only in constrained
Pros and ConsComparison of Alternatives • Corridor Typical • Pros • Lower Construction Cost • Introduction of alternative intersection treatment types – RCUTs • Lower Maintenance Cost • Cons • Additional farmland/wetland impacts • Constrained • Pros • Less impacts to farmland/wetlands • Evaluation for other corridors statewide • Cons • Higher Construction Cost • Higher Maintenance Cost
Nicollet Bypass Discussion • Construction • $10M - $15M • 4-lanes only • No Interchange • R/W • $4M • 4-lanes • Relocations • Interchange *Currently Unfunded
Nicollet Bypass Discussion • Why to west? • RSA – Critical Crash rate intersections • TH 14/TH 111 in Nicollet • TH 14/TH 99 in Nicollet • Local and Political Momentum • Local Infrastructure planning/needs • Wastewater treatment planning – North Mankato • City expanding • 2000 population – 890 • 2010 population – 1100 • 23.5% increase
Future MPC Meetings • TH 14/TH 15 Intersection Discussion • Alternatives • Discussion of inclusion with MN River Bridge in New Ulm in 2018 • Nicollet Bypass and funding impacts
Interim Safety Project Area Tuesday
Interim Safety Project Area Tuesday
Interim Safety Project Area Tuesday
Interim Safety Project Area Wednesday
Interim Safety Project Area Wednesday
Nicollet to Courtland Tuesday
Nicollet to Courtland Tuesday
Nicollet to Courtland Wednesday
Existing 4-lane – N. Mankato Tuesday
Additional Questions or Comments • Contact Information • Zachary Tess – D7 Project Manager • Zachary.tess@state.mn.us • 507-304-6199 • Corridor Website • http://www.dot.state.mn.us/d7/projects/14newulmtonmankato/