1 / 12

LEIR RUN 2007

LEIR RUN 2007. C. Carli & M. Chanel. Early beam regularly accelerated>1.2 10 10 charges (2.2 10 8 ions) in one bunch<200ns , e l ~40meVs/n >>25meVs/n, e h ~0.5 m m, e v ~0.18 m m, extraction efficiency(>80%???), synchronized to PS, energy matched (?). Performances(EARLY).

lenore
Download Presentation

LEIR RUN 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEIR RUN 2007 C. Carli & M. Chanel

  2. Early beam regularly accelerated>1.2 1010 charges (2.2 108 ions) in one bunch<200ns , el ~40meVs/n >>25meVs/n, eh~0.5mm, ev~0.18mm, extraction efficiency(>80%???), synchronized to PS, energy matched (?) Performances(EARLY)

  3. PERFORMANCES(EARLY)

  4. About 4 1010 accelerated , h=2, bunches<200ns , el<50meVs/n/b, eh~0.5mm,ev~0.18mm PERFORMANCES(NOMINAL)

  5. Beam dimension evolution during injection and cooling process PERFORMANCES(NOMINAL suite) H V

  6. Goal: accumulation , acceleration followed by deceleration, test of beam limits) Accumulation of 1.3 1011 charges, good life time. Acceleration and deceleration not finished (orbit&tune&RF…) PERFORMANCES (LONG ACCUMULATION…)

  7. Magnetic cycles as foreseen in DR. 200 ms tested over the linac3-LEIR chain. Emittances measurement systems works Spectra and (network) available in CCC (remote Desktop) Firsts tune measurements over cycles (helpful) RF HV power supply transfo…seems better….4 dead RF LL digital system improved (good reliability) Beam accelerated with synthetic btrain LSA quite stable over run Vacuum good EARLY is definitively done! What has been done

  8. Understand better Injection (mismatch, #parameters, acceptances) • RF LL digital • voltage feedback : after cooling, when the gap is opened, the gap voltage is not zero…and the bunching is not controlled. Long. emittance is very small after ecool and some mV can make some structure onto the beam. This, in addition to the IBS, gives emittance blowup), • Sometime, no acceleration. • Nominal not done (is the N particle a limit at acceleration?) • Machine not fully understood (chromaticity, lattice deviations, tests of different tunes) • Cooling not fully tested and measured (lifetime and cooling rate depending on current, electrons distribution: systematic measurements) • Extraction:do we have losses and where?. PS energy matching? PS matching not understood. Still to be done(1)

  9. Full control of Linac3 ramping&debuncher cavities, bumper parameters. Many applications to write for improving operation (spectra analysis, BIPM measurements, ecool beam trajectory, tune meas,….) OASIS, LASER to improve (nothing else that the other users) Transfos acquisition for beam survey and vistar Add transfer lines in LSA?? Reduce water consumption Solve the transfospb for the RF HV Power supplies. Still to be done(2)

  10. Gun and collector of ecool(spares arrive end of 2007?)…no change for collector (varnished in 2006) unless a bake out is needed(see ATC 28.10.2007). No quad&bending spares (work at <0.4 their power capacity) HV VPI’s feedtrough? ?DAMOCLES?

  11. A lot of work to finish some systems and understand the machine. A debriefing of the 2007 run and a prospect for 2008 is foreseen soon. In case of full LEIR stop for >18monthes, what are the needed actions (safety, protections…)? NEXT YEAR? OUR POINT OF VIEW: WE SHOULD RUN LEIR TO BETTER UNDERSTAND THE BEAM BEHAVIOUR

More Related