1 / 15

CLICdp news -- Monthly meeting March 3 rd 2014--

CLICdp news -- Monthly meeting March 3 rd 2014--. F ebr 6 th 2014 Courtesy : Katsu Coterra. Lucie Linssen. u pdate on CLICdp institutes. http:// lcd.web.cern.ch /LCD/Home/ MoC.html. CLICdp now : 22 institutes. u pcoming CLICdp -related events. CALICE meeting

leon
Download Presentation

CLICdp news -- Monthly meeting March 3 rd 2014--

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLICdp news-- Monthly meeting March 3rd 2014-- Febr 6th 2014 Courtesy: KatsuCoterra Lucie Linssen Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  2. update on CLICdp institutes http://lcd.web.cern.ch/LCD/Home/MoC.html CLICdp now:22 institutes Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  3. upcoming CLICdp-related events CALICE meeting March 19-21, Argonne lab https://indico.hep.anl.gov/indico/conferenceDisplay.py?confId=193 Americas Workshop on Linear Colliders May 12-16, Fermilab www.linearcollider.org/awlc14(registration is open) Will include a CLICdp meeting (afternoon of 13/5, evening in Europe) FCAL workshops May 26-27, Bucharest, hosted by ISS 2-day CLICdp meeting June 10+11 at CERN LCWS14,hosted by Vincainstitute October 6-10, Belgrade with an adjacent FCAL meeting being scheduled Next bi-monthly information meetings Monday, 15 hrs Dates: April 14th, June 30th, September 1st, November 10th, December 8th Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  4. FCC kick-off meeting • FCC kick-off meeting, University of Geneva • February 12-15 2014 • http://indico.cern.ch/event/282344/ • Meeting was well-attended (>300 registrants) • Lots of enthusiasm ! • …and lotsof work ahead. • Ambitious time planning • Setting up of large collaboration • Together for all accelerator+detector studies • Explicit request to unite with, and reuse efforts of, existing studies, like CLIC Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  5. FCC Kick-Off 2014 Future Circular Collider (FCC) Study R-D Heuer, CERN

  6. Why • Push the energy frontier beyond LHC • High Priority item within the European Strategy for Particle Physics • Timely • lead times for R&D very long • LHC physics program for ~20 years • Need for a project plan when LHC results indicate direction to go

  7. What • Technical/Conceptual Design Reports for linear e+e- Colliders exist: ILC/CLIC • Japan interested in housing ILC • Europe and CERN: participation in both • endeavours will be continued • Need to go beyond present energy frontier  circular high energy collider

  8. How • Exploitation of all options for such a project (hh – ee– ep) within one study • Global Collaboration for the Study of Future Circular Colliders • (similar to the CLIC collaboration) • Hosted by CERN

  9. Scope The main emphasis of the conceptual design study shall be the long-term goal of a hadron collider with a centre-of-mass energy of the order of 100 TeVin a new tunnel of 80-100 km circumference for the purposes of studying physics at the highest energies. The conceptual design study shall also include a lepton collider and its detectors, as a potential intermediate step towards realization of the hadron facility. Potential synergies with linear collider detector designs should be considered. Options for e-p scenarios and their impact on the infrastructure shall be examined at conceptual level. The study shall include cost and energy optimisation, industrialisation aspects and provide implementation scenarios, including schedule and cost profiles.

  10. Follow-up on FCC and CLIC (tbc/tbd) Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  11. CLICdp and AIDA-2 Following consultation with Institute representatives, CLICdp provided input for AIDA-2 proposal preparations. http://indico.cern.ch/event/289451/contribution/2/material/slides/ See also KonradElsener’s slides at today’s meeting Cross-community approach adopted: CLIC detector challenges and R&D activities have broad overlap with those of other projects (ILC, HL-LHC, FCC …..) CLICdp is not proposing any CLIC-specific WP/task within AIDA-2 Proposing participation in forefront cross-community technology challenges and infrastructures Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  12. Procedures for CLICdp speakers (1) from MoC Annex 4  Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  13. Procedures for CLICdp speakers (2) • Making your draft slides available • Make your slides available 2 days before the talk. • Use the CLICdp rehearsal category in indico https://indico.cern.ch/category/4772/ • Rehearsals • CLICdp rehearsals will normally only be organised for major events (LCWS, EPS-HEP, etc.). • If you wish, feel free to organise a rehearsal session yourself • Labeling of plots and results • Use CLICdp style, see https://svnweb.cern.ch/trac/clicdet/browser/trunk/doc/CLICStyle • Label your figures with “CLIC” or “CLICdp”. Use your judgement concerning which plots need the label (e.g. result-plots). Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  14. Procedures for CLICdp speakers (3) Proposal to follow the recommendations below. Will allow to gain further experience for CLICdp and refine the rules later • Which results and plots can be shown ? • In case of CALICE/FCAL/etc. studies => corresponding CALICE/FCAL/etc. rules apply • In case of CLICdp physics benchmark results • Normally only showresults that are already included in approved CLICdp-notes or publicly published elsewhere (e.g. in European or Snowmass strategy reports). • Exceptions to the above need to be shown in an analysis meeting, and permission explicitly asked for. • In case of CLICdp R&D results • Normally only show results that are already included in approved CLICdp-notes. • Exceptions to the above need to be shown in a CLICdp working group meeting, and permission explicitly asked for. • In case of results of detector optimisation studies • Only show plots which have previously been discussed in a relevant working group. • Generously put labels “Preliminary”and “Work in progress”on all plots that are not final. Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

  15. Questions or comments ? Lucie Linssen, CLICdp, bi-monthly meeting, March 3rd 2014

More Related