An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed ERCOT Nodal AGC Framework Bob Green Garland Power and Light Co. January 3, 2007

  2. Key Features • SCED Base Points follow the daily load profile (5 minute update) • REG and RRS deployments follow the frequency profile (4 second update) • NSRS provides generation capacity to SCED based on operator judgment

  3. Frequency will not be equal to 60 HZ because: • The sum of the governor 60 HZ Set Points is not equal to the ERCOT load • Real time load is different from the value dispatched in SCED • Units are not following control base points • Time lags and ramp limits in the AGC process • Unit trip(s)

  4. Problems with adding RRS deployment to the SCED input • Will cause frequency overshoot and reverse direction REG • Will probably cause units not bidding RRS to receive higher SCED Base Points

  5. Changes required in the Nodal Protocols • Delete 6.5.7.6.2.2 (9) • Modify 8.1.2.4.2 (1)