1 / 4

AeroMACS SARPS Validation Report from SESAR Project 9.16

AeroMACS SARPS Validation Report from SESAR Project 9.16. Sixth Meeting of the Surface Datalink Working Group Sendai, November 13 th -14 th , 2014. Domenico Cardamone Avionics LoB CTO/Capability Department. SESAR WP 9.16 Test Strategy.

lethak
Download Presentation

AeroMACS SARPS Validation Report from SESAR Project 9.16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AeroMACS SARPS Validation Report from SESAR Project 9.16 Sixth Meeting of the Surface Datalink Working Group Sendai, November 13th-14th, 2014 Domenico Cardamone Avionics LoB CTO/Capability Department

  2. SESAR WP 9.16 Test Strategy

  3. AeroMACS SARPS Validation Report from SESAR WP 9.16Contents This document presents a subset of the Validation and Verification results from the project SESAR 9.16. These results contribute to the validation of the AeroMACS SARPS. SESAR 9.16 Project Overview • Airbus & Selex ES & Test Benchs Description • Selex ES AeroMACS MS/BS prototype description • Summary of the Lab Test performed by Selex ES • Summary of the Test performed by Airbus Validation Items and Results Summary • Lists of AeroMACS SARPs Requirements and validation results Selex ES Tests Details Report • Lab Test Reports Airbus Tests Details Report • Lab Tests Report • Car Tests Report • A/C Tests Report

  4. AeroMACS SARPS Validation Report from SESAR WP 9.16 Main Results Selex ES Lab Test Report are OK (STEP 1) Selex ES has to test data transfer with Security and Handover with data transfer Airbus Test Lab Test Report are generally OK, remarks about a high PLR not confirmed during the static test field Airbus Test Lab Test Report has no report for data transfer with security (STEP2) Airbus static field test about RTT/Jitter/UDP-TCP Throughput are OK Airbus Car Test were limited by the limited signal coverage over the Airport, so mobility tests (doppler, handover and throughput) were not possible all over the airport surface (STEP3) Airbus A/C tests about AeroMACS integration on board are OK (STEP 4) Airbus A/C mobility test yet to be done.

More Related