180 likes | 277 Views
Opening Remarks. Alex Dzierba. GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003. Welcome. Prof. Hara Pertidou U of Thessaloniki - Greece Prof. Jim Pinfold U of Alberta - Canada Prof. Marco Reyes U of Guanajuato - Mexico .. And other visitors and thanks to our JLab hosts.
E N D
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003
Welcome Prof. Hara Pertidou U of Thessaloniki - Greece Prof. Jim Pinfold U of Alberta - Canada Prof. Marco Reyes U of Guanajuato - Mexico .. And other visitors and thanks to our JLab hosts
Reviews • Electronics - July 2003 • Calorimetry & Tracking • Software • Theory? • Lehman review (~ 1 yr)
Software Issues • PWA and phenomenology • NSF PWA center - GlueX/CLEO-c • Other proposals • Simulations/Reconstruction • Ed Brash/Richard Jones/Maciej Swat • Lehman review preps • GRID • Coordinate with Lab • G. Fox • DAQ • Coordinate with Lab/Tim Smith?
Funding • Coordinated NSF/DOE supplementals • CDRF and ISTC - US/Russia • Joint Canada/Mexico/US • Requests for R&D to JLab • Theory requests • Computer science
Collaboration Commitment • Nature of MOU’s • Physicists • Technical Staff • Other experiments • Adding/Removing Collaborators • Guidelines • Implementation
Equipment that Could be Completed • Magnet • End-plate holes? • Energize at IUCF? • LGD • Evaluate glass/pm’s • Frame, wall, monitor • Electronics
Projects that could be completed soon • Development of amplitude parameterization • isobar model • Deck effect • unitarity, analyticity, • particular attention to incident photons
Equipment Issues • Tracking • Design & manpower? • Vertex region • Calorimetry • Barrel readout • Prototypes • Upstream • Particle I.D. • Re-visit Cerenkov • TOF - OK • Magnetic issue • Forward/Cal - TOF - Cerenkov package
Infrastructure • Building • Can we go to architect? • Beam • Beam line design • Tagger design • Tagger magnet • Coherent multiple scattering? • Subsystem Integration • Use BarBar as paradigm
Schedule • Current schedule is painfully slow • Build the Hall and beamline before upgrade • Investigate physics at lower energy • Stage equipment installation
Analysis/Phenomenology • Amplitude Analysis • Understand ambiguities • Improve algorithms/throughput • Analysis of extant data • Phenomenology • Critique of isobar model • Model for backgrounds • Understand ‘theory’ systematic errors
Conclusions There’s a lot to doLet’s get busy