An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP3 progress report SEE-GRID-2 PSC05 Meeting, Thessaloniki, Greece 11-12 September 2007 Antun Balaz WP3 Leader Institute of Physics, Belgrade antun@phy.bg.ac.yu The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775

  2. Overview • WP3 objectives and activities • WP3 position in SEE-GRID-2 • WP3 deliverables and milestones • WP3 schedule • WP3 activities reports • WP3 country reports • WP3 Action points and issues SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 2

  3. WP3 objectives & activities (1) • Develop the next-generation SEE-GRID infrastructure • Next generation of EGEE middleware (gLite), the VOMS, the WMS, information services and file catalogue services will be assessed having in mind project and WP3 objectives • SEE-GRID infrastructure deployment regarding the middleware services will follow and adapt its services according to the results of the assessment. • Support in deployment and operations of the Resource Centres • Next generation monitoring services will be deployed so as to support the over-the-board infrastructure monitoring. • The current SEE-GRID helpdesk will be expanded in SEE-GRID-2, with the main goal of full EGEE interoperability. • Support the expansion and deal with the overall upgrade of the current infrastructure by proliferation of RCs in each SEE country increasing: • the total available regional resources (CPUs, storage, etc.) thus boosting the capacity and reliability of the provision of Grid services at regional level, and • the diversity and distribution of participating teams per country thus strengthening cooperation and collaboration at national level. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 3

  4. WP3 objectives & activities (2) • Network resource provision and assurance • WP3 will also deal with network resource provision, in close cooperation with the SEEREN2 project, thus ensuring stable connectivity for the RCs in the region. • Attention will be paid to Bandwidth-on-Demand requirements, to cater for bandwidth-intensive applications in case they need dedicated resources for particular experiments. • CA and RA guidelines and deployment • Regional SEE-GRID catch-all Certification Authority (CA) will continue to operate providing certificates for countries without a CA. • Experienced CA team will provide support for per-country CA deployment and accreditation. The cycle to establish a National Grid CA will be in compliance with the procedures and accreditation process of the EU Grid Policy Management Authority (EUGridPMA). • Operations will be strengthened so as to support per-country CA operations SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 4

  5. WP3 objectives & activities (3) • User portal deployment and operations • A user-friendly multi-Grid access portal will be deployed, enabling universal and more flexible user access to the regional infrastructure. • The work on the SEE-GRID-2 portal should increase the user-friendliness of being able to select a grid and execute a workflow on the selected grid, so that interoperability of different grids is seamlessly and transparently solved at the application (workflow) level. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 5

  6. WP3 objectives & activities (4) • A3.1 - Implementation of the advanced SEE-GRID infrastructure (UOB-IPB/IPP) • Deals with support for configuration, deployment and operations of the Resource Centres within the SEE-GRID pilot infrastructure, as well as transition of mature centres into EGEE. • Effort: 89 PMs • Subactivities: • A3.1.1 - Expand the existing SEE-GRID topology by inclusion of new sites per SEE country • A3.1.2 - Deploy M/W components and OS in SEE Resource Centers • A3.1.3 - Test the site installations in local and Grid mode • A3.1.4 - Operate the SEE-GRID infrastructure • A3.1.5 - Monitor the infrastructure performance and assess its usage • A3.1.6 - Certify and Migrate SEE-GRID sites from Regional Pilot to Global production-level eInfrastructures SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 6

  7. WP3 objectives & activities (5) • A3.2 - Network Resource Provision and BoD requirements (IPP) • Support liaison actions to ensure adequate network provision, including the requirements for Bandwidth-on-demand, if and where necessary depending on the application. • Effort: 39 PMs • A3.3 - Deploy and operate Grid CAs (GRNET) • Should provide CA and RA guidelines and help establish per-country CAs to cover the authentication issues • Effort: 73 PMs • A3.4 - Provide a user portal (SZTAKI) • Supports the deployment of a user-friendly and multi-grid interoperable portal for convenient Grid access and usage. • Effort: 15 PMs SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 7

  8. WP3 position in SEE-GRID-2 (1) WP1 Project Administrative and Technical Management WP2 Strategies & Policies WP3 Infrastructure & Operations WP4 Users & Applications A4.1: Select multi-disciplinary applications A3.3: Deployment and Operational support for accredited Grid Certification Authorities A2.1: Study grid deployment solutions A4.2: Adopt applications for the SEE user communities A4.4: Assess application usage A3.4: Grid access Portal A3.1: Implementation (deploy, test, operate, monitor, certify, migrate) of an advanced SEE Grid Infrastructure A2.2: Deliver sustainable roadmap for SEE NGIs A4.3: Support deployed applications A3.2: Network resource provision WP5 Training, Dissemination and Communication SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 8

  9. WP3 position in SEE-GRID-2 (2) • Results of WP2 will be used as inputs • D2.1 - Regional and National Organisational and Policy Schemes • D2.2 - Sustainable organizational and operational approach • D2.3(a,b) - Sustainability and Impact Analysis of SEE National Grid Initiatives • Results of WP3 used as input to WP4 • All partners participate in WP3 • Activities start in M1, end in M24 • WP3 planned budget is 672,512.00 €, or ~33.6% of the SEE-GRID-2 budget • WP3 is planned to take 216 PMs, or ~34.2% of all SEE-GRID-2 PMs SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 9

  10. WP3 Deliverables & Milestones (1) • D3.1a - Infrastructure Deployment Plan, M04 (CERN) • Describes the envisaged infrastructure deployment execution plan to be followed in the region. • Prepared and submitted on time • D3.2 - CA and RA guidelines for new candidates, M05 (GRNET/AUTH) • This deliverable describes the guidelines and best practices of the per-country CA and RA organization and policies. • Prepared and submitted on time • D3.3 - Portal specifications and functionality, M06 (SZTAKI) • This deliverable provides the characteristics and structure of the multi-grid user-oriented portal. • Prepared and submitted on time SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 10

  11. WP3 Deliverables & Milestones (2) • D3.1b - Infrastructure Deployment Plan, M14 (CERN) • Final version of D3.1. • Prepared and submitted on time • We are currently in M17 • Future:D3.4 - Infrastructure overview and assessment, M23 (UOB-IPB) • This deliverable presents an overview and assessment of the progress in the regional infrastructure and operations in the life of the project SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 11

  12. WP3 Deliverables & Milestones (3) • M3.1 - Infrastructure Deployment Plan Defined • M04, Status: OK • M3.2 - CA and RA guidelines for new candidates defined • M05, Status: OK • M3.3 - Portal operational across the pilot Grid • M12, Status: OK SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 12

  13. WP3 schedule • M01 - Start of WP3 • M04 - Infrastructure Deployment Plan (M3.1, D3.1a) • M05 - CA and RA guidelines for new candidates (M3.2, D3.2) • M06-Portal specifications and functionality (D3.3) • M12-Portal operational across the pilot Grid (M3.3) • M14 - Final Infrastructure Deployment Plan (D3.1b) • M17 – This is where we are currently • M23 - Infrastructure overview and assessment (D3.4) • M24 - End of WP3 (and of the project) SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 13

  14. WP3 activities overview • A3.1: Implementation of the advanced SEE-GRID infrastructure (UOB-IPB/IPP) • A3.2: Network Resource Provision and BoD requirements (IPP) • A3.3: Deploy and operate Grid CAs (GRNET) • A3.4: Provide a user portal (SZTAKI) SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 14

  15. A3.1: Overview • Infrastructure status • gLite deployment status • SEEGRID VO metrics and accounting • Operations • SLA conformance monitoring per site • Helpdesk tickets procedures and statistics analysis • GOOD shifts • MPI support on SEE-GRID sites • Operational & monitoring tools deployment & integration • HGSM • SAM (+ porting to MySQL) • WiatG • R-GMA • Pakiti • SEE-GRID Wiki status • WP3 developments • Infrastructure, Site and VO metrics SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 15

  16. Infrastructure status (1) • Concerning the middleware deployments, the current SEE-GRID infrastructure supports a set of core services which provide user access to resources: • Catch-all Certification Authority for the region has been officially accredited by the EU Grid Policy Management Authority - EUGridPMA, and is currently operational thus enabling regional sites to obtain user and host certificates • Virtual Organisation Management Service (VOMS), server has been installed as an authorization system for the SEE-GRID Virtual Organisation (VO), which provides information on the user's relationship with the Virtual Organization, his/her groups, roles and capabilities • Workload management service (lcg-RB and glite-WMSLB) and Information Services (BDII) nodes (several instances) have been installed at partners’ sites and are operational • MyProxy is operational, and supports certificate renewal • FTS deployed and used in production SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 16

  17. Infrastructure status (2) SEE-GRID total and free CPUs in the last year SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 17

  18. Infrastructure status (3) • SEE-GRID infrastructure contains currently the following resources: • 30 sites in SEE-GRID production • 6 sites in certification phase (2 AL + 1 HR + 2 RO + 1 MD) • CPUs: 1105 total, but unknown number available to SEEGRID VO; increase of approx. 400 CPUs compared to PSC04 • Storage: 17.6 TB (no increase) • All sites on gLite-3, with 3 sites on gLite-3.1 and the rest on gLite-3.0 • glite-CE final assessment by EGEE is that this service is not stable enough for production; we agree • glite-WMSLB actively used • Guides provided for deployment of gLite-3.1 WNs on SL4.5 (32-bit); in preparation guide for 64-bit WNs SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 18

  19. Infrastructure (4): VO membership • steady growth • start of project • ~90 members • end of 02/07 • ~110 members • end of 08/07 • ~160 members SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 19

  20. Infrastructure (5):VO members per country SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 20

  21. Operations (1) • SLA conformance monitored per site; tools used: • HGSM • SAM • GStat • WiatG • Helpdesk • SLA conformance analysis: • SEEGRID2-WP3-RS-018-SLA-Q5-2007-08-06.xls • Helpdesk tickets procedures • GOOD shifts introduced, initial results positive • Tickets handling: response times need to be improved! • Problems with GOOD shifts – some partners not performing duty! • Helpdesk statistics analysis: • SEEGRID2-WP3-RO-008-PSC05-Helpdesk_Statistics-2007-09-10.xls • SEEGRID2-WP3-RS-020-PSC05-Tickets_not_closed-a-2007-09-11.xls • OPS role implemented in VOMS, documented, implemented & used SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 21

  22. Operations (2) • MPI support on SEE-GRID sites • Important for many applications • Current support not sufficient • Seems there is a problem with setup on some sites – GOOD shifts are addressing this, but this is not sufficient • Proposal: WG to be created which should define minimal standards for MPI support, and provide template scripts and JDL files for submission of MPI jobs • WG can be composed of representatives from sites supporting MPI and having experience: • Bulgaria • Turkey • Greece • Serbia SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 22

  23. Operational & monitoring tools • Operational & monitoring tools deployment status • HGSM – Turkey • SAM (+ porting to MySQL) – Bosnia and Herzegovina with CERN support • BBmSAM (Bosnia and Herzegovina) • WiatG • R-GMA – Bulgaria • Pakiti SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 23

  24. HGSM (1): Background • HGSM is a central database that holds all crucial information about a grid site • It has an interactive interface for users to see and update the information available in the database • It has exports to interface with other services to enable integration between HGSM and other services that make use of HGSM's information • HGSM is constantly improved with new features and new exports to enhance its functionality, role and information exchange over grid services for administrative purposes SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 24

  25. HGSM (2): Latest Development Period (Initiation and Planning)‏ • Started in May-2007 with appearance of requests for new functionality and enhancements due to inefficiency of HGSM in some areas in the GIM list. • Since the requests was big and required some major changes in HGSM structure, an “Internals Document” is prepared and passed to people in the discussion in the end of May. • During June, the requests are anaylzed and refined down so everybody was aware of the missing parts, possible solutions and impacts of the new functionality SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 25

  26. HGSM (3): Latest Development Period (Finalizing and Taking Action)‏ • In the end of June a detailed “Roadmap Document” -which covers the problems, solutions and a step-by-step action plan in every detail- is prepared and opened for discussion in the GIM list. • The Document is revised and updated according to feedback taken by the list. Document yielded 4 revisions, three drafts and a final which is published on Jul 12, 2007. • Active development started on Jul, 16 according to plan announced in the Document. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 26

  27. HGSM (4): The Improvements (and Progress So Far)‏ • Following improvements are qualified for this development period: • Revision of visual interface fields. • Introduction universal exporting subsystem which can be used by humans and other computers. • Introduction of an importing subsystem which can import exported data for administrators. • An automatic field filling tool for administrators. • Functionality improvement on various pages of visual interface. • Improving the handling of supported applications in HGSM and developing a MAUI configuration editing tool for reflecting changes to grid sites directly and automatically. • Enabling HGSM to track site information history for statistical purposes. (100%)‏ (80%)‏ (0%, 10 Sep)‏ (0%, 24 Sep)‏ (0%, 8 Nov)‏ (0%, 22 Nov)‏ (0%, 3 Dec)‏ Note: Dates indicate rough estimations of kick-off dates. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 27

  28. SAM/BBmSAM • SAM Server Portal • BBmSAM • Service availability and SLA calculations implemented • MAINTENANCE status implemented in a better way • Enhanced OVERVIEW (main) page of BBmSAM • Showing uptime for last 24h • Filters available for: country, tier, certified status, last test state • BBmobileSAM • Now also showing uptime percentage for last 24h • HGSM integration • Preparation for HGSM shift to new version • Database • Now running strictly off MySQL, no Oracle used • Reorganization of indexes – improved performance SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 28

  29. WiatG: Introduction SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 29 • Web application for visualization of BDII information • http://bdii.phy.bg.ac.yu/WiatG/pl/WiatG.pl • Used as an operational tool for site monitoring • Highly responsive tool because it uses AJAX • Partial refresh (client receives part by part of the page) • Asynchronous (server is processing in the background, so one may send several requests) • Current version seeks for: CE, gCE, RB, gRB, SE, LFC, FTS and GridICE • Documentation available: • http://wiki.egee-see.org/index.php/WiatG SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

  30. WiatG: Who is using it SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 30 • Several regional projects • EUMedGRID (bdii.isabella.grnet.gr) • EUChinaGrid (euchina-bdii-1.cnaf.infn.it) • EELA (lnx112.eela.if.ufrj.br) • BalticGrid (bdii.mif.vu.lt) • Int-EU-Grid (i2g-ii01.lip.pt) • Health-e-Child (hec-maat-server2.cern.ch)http://hec-maat-server1.cern.ch/WiatG/pl/WiatG.pl • ROC CERN • PROD (lcg-bdii.cern.ch) • PPS (pps-bdii.cern.ch) • OPS (sam-bdii.cern.ch) SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

  31. WiatG: Technologies SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 31 • Following technologies are included in WiatG: • Perl is used for LDAP connection to BDII and generation of HTML and XML data. • XML, the format for sending data from the web server to the client. • Cascading Style Sheets (CSS), a markup language used to define the presentation style of a page. • JavaScript, a scripting language. • XMLHttpRequest, an object that is used to exchange data between web client and web server. • Document Object Model (DOM), which provides a logical view of a web page as a tree structure. SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

  32. WiatG: Architecture WiatG Server Side Browser Client XMLHTTPRequest ApacheHTTPServer HTTP Request LDAPtoXML script XMLHTTPRequest callback() XML Data Java Script Call HTML & CSS Data Query Response LDAP User Interface BDII SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007 SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 32

  33. WiatG in action SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 33 SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

  34. WiatG: Further development(short term) SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 34 • Addition of new services (MyProxy, localLFC, VO software tags, …) • Development of the new tool “What should be at the Grid” (WsbatG) • Based on the site configuration exported from HGSM/GOCDB • Visually identical tool, providing the expected status of BDII in WiatG SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

  35. WiatG: Further development(long term) WiatGS User Interface WiatG User Interface WsbatG User Interface HGSM/GOCDB web service BDII web service sBDII web service Check equality of sBDII-BDII information Check correctness of BDII data Check correctness of HGSM/GOCDB data Check correctness of sBDII data Check equality of BDII-HGSM/GOCDBinformation Alarms Dashboard Alarms Dashboard UI SAM SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007 SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007 SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 35

  36. R-GMA (1) Accounting views for SEEGRID-only sites per site accounting: • https://gserv1.ipp.acad.bg:8443/Accounting SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 36

  37. R-GMA • Accounting views for SEEGRID and EGEE sites that support SEEGRID – per country/institution user accounting https://gserv1.ipp.acad.bg:8443/Accounting-2 SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 37

  38. R-GMA (2) • Accounting views for Job success rates and other statistics –in progress, currently running on our own data only. https://gserv1.ipp.acad.bg:8443/Jmon SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 38

  39. R-GMA (3) • Accounting views for Job success rates and other statistics –in progress, currently running on our own data only. https://gserv1.ipp.acad.bg:8443/Jmon SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 39

  40. Pakiti: Overview • Pakiti Client • Installed on all nodes • Checks software versions against configured repositories • Sends report once per day to pakiti server • Pakiti Server • Running at the Aristotle University of Thessaloniki • Main Components: • Feed • Daily reports from clients • Site Administrator’s front-end • Detailed view of the rpm package status at each node • Access is permitted only to each the administrator’s of each site via TLS Authentication using X.509v3 Certificates • Addon Components • ROC Manager’s front-end • Aggregated view of the status of all the sites in the ROC • Developed by the AUTH GOC SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 40

  41. Pakiti: Status of the Service • Romania • RO-01-ICI • Serbia • AEGIS01-PHY-SCL • AEGIS02-RCUB • AEGIS03-ELEF-LEDA • AEGIS04-KG • AEGIS05-ETFBG • Turkey • TR-01-ULAKBIM • TR-05-BOUN Pakiti enabled sites in SEE-GRID ROC: • Bosnia Herzegovina • BA-04-PMFSA • Bulgaria • BG01-IPP • BG02-IM • BG04-ACAD • BG05-SUGRID • Croatia • HR-01-RBI • Greece • HG-01-GRNET • HG-03-AUTH SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 41

  42. Pakiti and reporting • The deployment of pakiti on sites is voluntary • Sites deploying it provide accurate information on updates status on their nodes • Proposal is that, in order to further improve status of SEE-GRID sites, all sites report in their 3M reports the following: • Middleware version changes during the quarter • Status of updates (not needed if pakiti is deployed) • Major operational issues • Template will be provided for this; if pakiti is deployed) such report would just contain one line with gLite version changed and paragraph or two describing operational issues encountered (basically, structured version of section 2.3 of 3M reports, now submitted by each site) SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 42

  43. SEE-GRID reorganized Wiki • Reorganized SEE-GRID Wiki is now the main Wiki • http://wiki.egee-see.org/index.php/SEE-GRID_Wiki • Many documents still missing, main being: • Participating in SEEGRID as a Site (AP1) • Policy Documents (AP3) • SEEGRID certification procedure (AP4) • LFC (AP6) • RGMA (AP7) • My Proxy (AP8) • BDII/RB (AP9) • FTS (AP10) • SAM (AP11) • GridICE(AP12) • How to Join the SEEGRID infrastructure as a user (AP14) • Grid usage basics (AP16) • Effort needed by all partners; UKIM coordinating SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 43

  44. WP3 developments • HGSM • WiatG • Accounting • glite-yaim-seegrid • soon-to-be deployed apt/yum repository SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 44

  45. Infrastructure, Site and VO metrics • Infrastructure growth (CPUs, storage, memory?) • Bandwidth growth? • Site availabilities and downtimes (CE, SE) • Accounting data (per site, per country, per application, per VO, per user community, time distribution); here SEEGRID VO and national VOs should be considered • Job success rates (per site, per country, per application, per VO, per user community, time distribution); here SEEGRID VO and national VOs should be considered • VO membership time evolution, distribution per country, per application, per user community; here SEEGRID VO and national VOs should be considered SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 45

  46. A3.2: Status • Concerning the bandwidt-on-demand some tests were done in order to investigate the following protocols and services using our new router - CISCO 12000 XR: • Resource Reservation Protocol (RSVP); • Generalized Multi Protocol Label Switching (GMPLS); • Differentiated Services (DiffServ); • Standard activities for BoD. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 46

  47. A3.3: Overview of the work • CA establishment in SEE Region • Each country must setup each own national Certification Authorities • Each CA must be accredited by the EUGridPMA • see-ca-incubation mailing list (see-ca-incubation@grid.auth.gr) • Support during the process of establishing a new CA and for the accreditation period • CA common procedures and best practices advices are provided • Help on writing the CP/CPS documents • Process for establishing a new CA takes around one year SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 47

  48. A3.3: Status • New accredited CAs in the Region • Serbian CA (AEGIS CA) • Accreditation request on August 23, 2006 • Under review by GridAUTH team and SRCE CA (on behalf of EUGridPMA) • Accredited on June 1, 2007 • Operational since June 10, 2007 • Romanian CA (ROSA CA) • Accreditation request on January 25, 2006 • Under review by GridAUTH team, PK-GRID CA and CESNET CA (on behalf of EUGridPMA) • Accredited on August 1, 2007 • Grid CA candidates • Montenegro CA (MREN CA) • CP/CPS reviewed by GridAUTH (via see-ca-incubation mailing list) on July 10, 2007 • F.Y.R.O.M. CA (MARGI CA) • Accreditation request on May 4, 2007 • First CP/CPS not yet available • All candidates are encouraged to participate at the EUGridPMA meetings (Next meeting in Thessaloniki, Sept 19-21) SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 48

  49. A3.4: Overview • Official SEE-GRID2 Portal user maintenance (52 users) • Quota management, user management • Official SEE-GRID2 Portal maintenance • Software (P-GRADE Portal version 2.5) • P-GRADE Portal software bug fixing SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 49

  50. A3.4: Status and development • Portlets development has been done by turkish partner (P-GRADE Portal Development Alliance) • Already active /beta-test/ in a private portal installation. • New portlets • File Management Portletto manage the remote files through the LFC catalog and the LCG interface. • Hot topic! • Intended to merge into official P-GRADE Portal v2.5. • Credential management portlet to complement the existing certificate portlet with info, change pass-phrase and destroy operations. • Intended to merge with the default certificates portlet. SEE-GRID-2 PSC05 Meeting - Thessaloniki, Greece, 11-12 September 2007 50