An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MERIT status Fabich CERN VRVS 9th Oct. 2007 A. Fabich, CERN, VRVS 9th Oct 2007

  2. Logbook • Monday 8 Oct, morning: • Hg primary at 77 deg C • Solenoid at 150 K typically • Monday afternoon: access • Optics repaired • Mercury loop closed (without Allen screws) • Set point at 30 degC (primary) and 20 degC (secondary); secondary temperature sensor at downstream end (cone/outside). • Monday evening: • cooling initiated to 90 K (at 10-20 % LN2 filling level) • Tuesday 9 Oct, morning (6:30): • Reached 90 K • Mercury stabilized at 20-30 deg C • Tuesday afternoon (14:00-14:30): • Nominal cooling cycle with 100% filling level and emptying A. Fabich, CERN, VRVS 9th Oct 2007

  3. Frontend during cryo-cycle 11am 2:30pm 2:55pm 4:10pm A. Fabich, CERN, VRVS 9th Oct 2007

  4. Temperature readings A. Fabich, CERN, VRVS 9th Oct 2007

  5. Recommendations and future actions • Wednesday afternoon: Mercury test drive • Allen screws not fixed. Issue? • Front screw not in place. Issue? • Thursday afternoon: access ~2h • Fine adjustment of optics • 10 minutes opening primary (all) • 30 minutes last adjustments for optics (HP) • 20 minutes closing primary (all) • 60 minutes putting system in nominal position (AB/ATB, transport) • Verify vacuum • how to open valve at lower solenoid? • Connect solenoid power • Assure feed-throughs without ice/water. This causes short-circuits. • HIPOT test • Cleaning of the area. A. Fabich, CERN, VRVS 9th Oct 2007