Content • Introduction • Concept • Technology • Cases • Conclusion
Introduction 1G 2G 3G 4G
Concept • District heating schemes are operating with various temperature levels depending on the original design of the network and the connected building stock • In many cases existing buildings may require high supply temperatures and consequently have high return temperatures, f.ex. supply of 90-100°C and return of 40-60°C • Sufficient temperature levels vary and depend on the heating installations • New energy efficient buildings with floor heating installation only need supply temperatures of 35-40°C to fulfill their heating requirement • Domestic hot water (DHW) temperature of 45°C is considered sufficient for everyday use. Having DH supply temperature of 50°C is sufficient for preparing DHW at 45°C via instantaneous heat exchanger solution, without risk of Legionella. • This fact gives the opportunity to utilize the return flow from existing areas in new areas and hence utilize the capacity of existing DH networks to a greater extend with minimum investment costs. • Utilize further the capacity of the distribution network • Increased efficiency at the plant due to lower return temperature • Reduced heat losses in the return line
Conceptual example of cascading energy usage in district heating Non-renovated older buildings D Recently build and renovated F D F F F F F multi-apartment F C C single-family C C C Newly constructed / renovated areas Low-energy buildings Large scale solar C A C A C CHP natural gas All energy classes Low temperature return, 25°C High temperature supply, 90°C High temperature return, 50°C CHP waste incineration
Utilization of return water for existing buildingsRenovation of the existing network Low Temperature District Heating
Low Temperature DH for existing buildings • Project supported by the Danish government • 75 single-family buildings from 1997 • Floor heating Realisation • New low-temperature DH in-house substation • New DH network • Heat loss reduced from 41% -> 14% • 80% of heat demand supplied from main DH return line • Before transition average Tsupply = 70-75°C • After transition average Tsupply = 55°C
Area substation • As the DH return temperature can vary it may become necessary to raise the return temperature before it is supplied to the secondary network • This can be achieved by mixing the return water with hot water from the main DH supply pipeline Sønderbylow temperature DH SønderbyLast consumer Primary network SønderbyArea substation Tsupply=52°C Tsupply=90°C Substation at the consumer Treturn=52°C Thermostatic bypass Treturn=26°C
Micro booster – Reduced temperature levels Ultra-Low Temperature District Heating
Objective: Maximum utilization of district heating return flow Area substation Ultra-Low Temperature DH for existing buildings • Project supported by the Danish government • 4 single-family buildings from before 1960 • Radiators, mix of 1 pipe and 2 pipe systems Realization • Micro heat pump DH substation in each house to boost the supply temperature for instantaneous preparation of Domestic Hot Water • New U-LTDH network • Heat loss only 46% of the heat loss that would be experienced in a traditionally designed network • Area heat exchanger substation connected to the main district heating network regulates the supply temperature • Supply temperature kept as low as possible at all times
Micro booster concept • For floor heating temperature levels of 30-40°C are sufficient • Domestic hot water of 45°C is sufficient for all normal use • With instantaneous preparation of DHW there is no risk of Legionella • Micro heat pump unit boost the supply temperature to 53-55°C and stores the water in a primary side located storage tank until DHW tapping occurs Micro booster installed Instantaneous DHW preparation No Legionella risk DH side storage tank Condenser Evaporator
Heat exchanger area substation • The aim of the substation is to maintain constant secondary side temperature of 40°C • As the DH return temperature can vary primary side supply is mixed with the return to maintain constant 45°C supply to the heat exchanger by means of a pump control
Low-temperature DH for existing buildings • Supported by the Danish government • 8 single-family houses from 1970 • With traditionalradiators: 70/40/20°C • How much could Tsupply be reduced without sacrificing comfort? same radiatorsṁ = constant heat output 55 % heat output 100 % 70°C 40°C 50°C 33°C • Numerical simulations • Many possibilities • Various refurbishment stages • Low-temperature radiators • Real measurements • Should follow real conditions • Results are coming soon…
Duration of Tsupover/equal certain temperature Heating curves for radiators • Single-family-house from 1970 – results from simulation hours above certain temperature [%/a] Tsupply [°C] ! ! Low-temperature substation for DHW = *Extensive renovation = low energy windows + roof insulation
LTDH for Existing Buildings • Existing buildings can be supplied with LTDH already today if Tsupplyis in cold periods increased above 50°C • Required Tsupply to radiators depends on: • desired indoor temperature • state of the building • heating system • DH companies should be more strict in reducing Tsupplyto: • reduce heat losses from DH network • integrate more renewables • DHW applicatoin should always be changed to low-temperature one
Conclusions • There is a potential to further utilize the capacity of existing district heating network and reduce the network return temperature significantly by cascading the energy use • Studies show that with light renovation of buildings the requirements to the DH supply temperature sinks significantly • As new areas are built or building areas renovated close to existing district heating network it is possible to establish district heating network with low investment costs utilizing the remaining heat in the return pipeline from the existing DH grid