1 / 6

Draft MOU UCB/AS/NTHU

Draft MOU UCB/AS/NTHU. Summary to University Senate 11 January 2005. Exchange Programs. Faculty & Postdocs – exchange, all fields Dual PhD Program – all fields Two supervisors, one student, joint project Satisfy UCB Requirement, award UCB PhD Satisfy NTHU Requirement, award NTHU PhD

Download Presentation

Draft MOU UCB/AS/NTHU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft MOUUCB/AS/NTHU Summary to University Senate 11 January 2005

  2. Exchange Programs • Faculty & Postdocs – exchange, all fields • Dual PhD Program – all fields • Two supervisors, one student, joint project • Satisfy UCB Requirement, award UCB PhD • Satisfy NTHU Requirement, award NTHU PhD • Summer Session, NTHU Undergraduates • Core courses taught by NTHU professors (with added compensation) • Students who attend 3 full sessions can graduate in 3 years • Total NTHU students in residence in summer: 1000

  3. Physical Infrastructure for NTHU Personnel • Two half-floors of New Cambell Hall (5 yr) • Immediate rental in downtown Berkeley • Dormitory space for students in summer • Co-develop Richmond Field Station (3 yr) • Build or rent dormitories for NTHU visiting faculty and other personnel in Berkeley/Richmond area. Initial estimate 30 faculty members per year.

  4. Mirror Site in Jhudong • Forty hectares to be deeded to Tsing Hua by Hsinchu County on 12 Jan 2005 • Tsing Hua Labs • Space allocated to UCB for 5 years, renewable indefinitely, to be furnished and equipped at UCB expense

  5. California Costs • One-time capital costs of 2 half-floors of New Cambell Hall, actual cost of constructing space plus 6 million USD = 0.8 billion NTD? 50 years occupancy. (Compare with AS deal with NTU.) • One-time cost of equipping nano/info/bio labs: 0.3 billion NTD? • Co-occupancy of rented space in Richmond Field Station: 0.5 million USD per year = 0.1 billion NTD for 5 years? • Rental of downtown Berkeley office space = 0.3 million per year = 0.05 billion NTD for 5 years? • 1000 summer session undergraduates who pay California tuition and (negotiated) dormitory fees = 0.15 billion per year?

  6. Funding • Cost of New Campbell Hall construction: private donations which President Lee will raise. • Graduate student support for dual PhD program: special university-university program to be supported by NSC at 0.15 billion NTD for first year. • Undergraduate students: NTHU alumni interested in supporting with scholarships • Support for NTHU faculty and postdocs – NTHU responsibility. • Operating funds from government probably means opening up program to other universities.

More Related