1 / 21

Welcome to the COST 723 Meeting! Bern, October 6-7, 2003

Welcome to the COST 723 Meeting! Bern, October 6-7, 2003. COST 723 WG1 Meeting 1, Common Session WG1 + MC Bern, October 6-7, 2003. Stefan Buehler University of Bremen sbuehler@uni-bremen.de. Overall Activities. Delay due to COST move to ESF

livana
Download Presentation

Welcome to the COST 723 Meeting! Bern, October 6-7, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to the COST 723 Meeting!Bern, October 6-7, 2003

  2. COST 723 WG1 Meeting 1, Common Session WG1 + MC Bern, October 6-7, 2003 Stefan Buehler University of Bremen sbuehler@uni-bremen.de

  3. Overall Activities • Delay due to COST move to ESF • Web site and mailing lists at http://www.cost723.org • COST 723 splinter meeting at EGS/Nice • Opening Workshop planned at ESTEC • Date (to be reconfirmed at this meeting): March 11-13, 2004 • Collection of COST 723 related EGS presentations on cost723.org COST 723 WG1 Meeting 1

  4. Radiosonde Humidity Ozone Aircraft MOZAIC MARSCHALS Satellite AMSU Odin Envisat Champ WG1 Activities • Established contacts to data sources: • We will learn about ongoing activities in these areas in the next two days (hopefully). COST 723 WG1 Meeting 1

  5. AMSU-B Humidity Data Stefan Buehler University of Bremen

  6. Operational Microwave Humidity Data Platform Instrument Launch DMSP F-13 SSM-T2 March 95 DMSP F-14 SSM-T2 April 97 NOAA-15 (NOAA-K) AMSU-B May 1998 NOAA-16 (NOAA-L) AMSU-B September 2000 NOAA-17 (NOAA-M) AMSU-B June 2002 Aqua HSB May 2002 COST 723 WG1 Meeting 1

  7. Figure by M. Kuvatov COST 723 WG1 Meeting 1

  8. AMSUB Channels Figure by V. Oommen-John COST 723 WG1 Meeting 1

  9. Peak altitude of Jacobians gives sounding altitude Figure by V. Oommen-John Wettest day in 2002 (July 17) Driest day in 2002 (January 5) COST 723 WG1 Meeting 1

  10. Lindenberg Radiosonde Data Solid: RH, dashed T, dotted RH_icesat Figure by M. Kuvatov Wettest day in 2002 (July 17) Driest day in 2002 (January 5) COST 723 WG1 Meeting 1

  11. Match-up Procedure • Problems: • Sonde drifts during ascent • Time difference between sonde launch and overpass  Pixel level comparison not possible Figure by V. Oommen-John COST 723 WG1 Meeting 1

  12. Solution: Look at a target area, we take a 50km circle. Figure by M. Kuvatov Striking: Atmospheric inhomogeneity can be a problem. COST 723 WG1 Meeting 1

  13. Standard deviation of brightness temperatures inside the target area. Vertical lines are from operational calibration. Number of Occurrences Figure by V. Oommen-John COST 723 WG1 Meeting 1

  14. Error Model • The 50km inhomogeneity is the dominant error source. Error model:si = C0 + s50km • C0 is small, we take 0.5K. COST 723 WG1 Meeting 1

  15. Comparison Lindenberg radiosonde humidity vs. AMSU-B on NOAA15, time period 2002. Discrepancies in the UT for very dry conditions. Figure by M. Kuvatov COST 723 WG1 Meeting 1

  16. Radiosonde Stations in COST 723 Countries (from Met Office Archive) Figure by V. Oommen-John COST 723 WG1 Meeting 1

  17. Satellite Data as a Tool to Compare Different Stations Lindenberg / Germany (Vaisala RS80) Kem / Russia (Goldbeater skin) Figure by V. Oommen-John COST 723 WG1 Meeting 1

  18. Conclusions • It is worthwhile to compare operational satellite humidity data and radiosondes. • Comparison in radiance space avoids inverse problem. • A good match-up methodology is crucial. • Tests consistency of: Satellite Data RT Model Radiosonde Data COST 723 WG1 Meeting 1

  19. Draft Workshop Program, Day 1 COST 723 WG1 Meeting 1

  20. Draft Workshop Program, Day 2 COST 723 WG1 Meeting 1

  21. Draft Workshop Program, Day 3 Do we also have to put in a short MC Meeting? When? COST 723 WG1 Meeting 1

More Related