Ensure compliance with specifications and regulations for cranes, derricks, hoists, elevators, & conveyors in construction. Follow protocols for equipment inspection, maintenance, and operation to maximize safety.
E N D
Cranes, Derricks, Hoists, Elevators, & Conveyorsfor Construction
Manufacturer's specs/limitations • Comply with them • Specs not available? • Attachments for cranes 1a
Conspicuously post • Rated load capacities • Recommended operating speeds • Special hazard warnings • Instructions 2a
Hand signals operators • Prescribed by ANSI standard • Post illustration of signals 3a
Competent person • Inspect equipment • Prior each use • During use • Safe operating condition • Annual inspection • Maintain records 4a
Wire rope • Take out of service • ANSI B 30.5-1968 • SAE J959-1966 5a
Belts, gears, exhaust pipes • Reciprocating, rotating, moving parts • Guarded if dangerous • ANSI B 15.1-1958 Rev. 6a
Belts, gears, exhaust pipes • Guard/insulate exhaust pipes • Internal combustion engines • Test enclosed spaces 6b
Crane swing radius hazards • Barricade • Prevent struck-by • Prevent crushed-by 7a
Fuel transportation • 29 CFR 1926 Subpart F • On public highways • 49 CFR Parts 177 and 393 8a
Fire extinguishers • Accessible • 5BC rating • All operator stations/cabs 8b
Clearance near electrical lines • 50 kV minimum 10 feet • Over 50 kV 10 feet plus 9a
Equipment in transit • Less than 50 kV 4 feet • Over 50-345 kV 10 feet • Up to 750 kV 16 feet 9b
Observer • Visual means difficult • Designate observer • Warn operator 9c
Modifying equipment • Get written approval • Change signage • Original safety factor • Employee safeguarding 10a
Personnel platforms • Don’t use a crane • Exceptions • Hoisting procedure • Load line strength • Uniformly level • Total weight 11a
Personnel platform design • Qualified engineer/qualified person • Support capabilities • Guardrail system • Grab rail installed • Access gates 12a
Personnel platform design • Standing headroom • Hard hats • Overhead protection • Marked accordingly • Rated load capacity 12b
Personnel platform use • Abide by work needs • Employees, tools, materials • Not just materials/tools • Secure materials/tools • Evenly distribute 12c
Trial lifts • Unoccupied personnel platform • Load to equal lift weight • Made from ground level 13a
Operator checks • Systems, controls safety devices • No interferences exist • 50% limit/rated capacity 13b
Inspection after trail lift • Competent person inspects • Crane or derrick • Rigging 14a
Inspection after trail lift • Personnel platform • Base support • Determine defects/adverse effects 14b
Proof testing • Proof test to 125% rated capacity • Competent person inspects • Correct deficiencies 15a
Personnel platform safety • Body parts inside platform • Secured to structure • Operator remains at controls • Indication of danger • Continuous sight of Operator • Body belt/harness system 16a
Traveling and hoisting • Prohibited • Exception to rule • Travel restrictions 17a
Pre-lift meeting • Contents • Review requirements/procedures • Crane operator • Signal person • Employee to be lifted • Person responsible • Each new work location 18a
Helicopter cranes • Comply with FAA • Conduct briefing • Plan of operation 19a
Material hoists • Mfg's specs/limitations • Post information • Defective wire rope 20a
Hoist operating rules • Established and posted • Signal system • Allowable line speed • Post on car frame • "No Riders Allowed" 21a
Overhead hoists • Safe working load • Supporting structure load • Hoist installation • Air hoists • Mfg’s specifications 22a
Conveyors • Audible warning signal • Emergency stop switches • Guard screw conveyors • Working blew conveyor • Mark all crossovers • Lockout/tagout • ANSI B20.1-1957 23a