430 likes | 443 Views
Learn about the mechanical and plumbing systems management training session held at Jumeirah Beach Residences Sector 3 on November 15th, 2006. Explore HVAC, plumbing, drainage, fire protection, air conditioning, and more in this comprehensive overview.
E N D
Management training Presented by Jumeirah beach residencesector 3 November 15th 2006
Jumeirah beach residence Sector over view Located between sector 1 and Al Fattan hotel
Jumeirah beach residencesector 3 7 towers ranging from 30 floors high to 52 floors high 5 level podium out of which 3 levels are car parking MEP plant rooms in basement, mid-level(s) and roof.
Mechanical systems involvedHVAC • Air conditioning system • Toilet extract system • Kitchen extract system • Refuse extract system • Lobby relief and stair well pressuristaion system • Car park ventilation system
Mechanical systems involvedPlumbing • Domestic cold water system • Hot water system
Mechanical systems involvedDrainage • Soil waste and vent systems • Rain water systems
Mechanical systems involvedFire protection • Wet riser • Sprinkler protection • FM 200 system • Carbon di oxide system • Pre action system
Air conditioning system • Fresh air system • Standalone fan coil units • Common area fan coil units • Dx system for MDF rooms in grade level
Fresh air system Pre filters Bag filters Heat wheel Cooling coil Supply and extract fans
FAHU with heat recovery wheel Heat wheel Heat wheel recovers energy from cold toilet exhaust And pre cool the fresh air intake
Fresh air system FAHU are located in plant rooms. Fresh air intake through sand trap louvers Fresh air supply to apartments and lobbies
Fan coil units Fan coil units are provided with filters, cooling coil and fan Air distribution with ducting and grilles and diffusers
Fan coil units Thermostat are provided with temperature and speed control.
Dx system MDF rooms in the grade level have been provided with DX system Units are provided on duty/standby basis
Chilled water system Energy transfer stations are located in the basement level Each tower has its own ETS and two dedicated stations for podium.
Chilled water systemTertiary Tertiary heat exchangers and chilled water pumps are located in midlevel Plant rooms.
Chilled water system View of chilled water pumps
Chilled water system View of Energy transfer station (heat exchanger)
Toilet extract system Fans part of FAHU Ducting system with ceiling mounted diffusers in toilets Operation of the fan will be in tandem with FAHU
Kitchen extract system Centrifugal fans located in the plant rooms Centralised ducting and extract from diffusers mounted in kitchen Air is passed thru carbon filter assembly (odour removal unit) prior to Discharge to atmosphere.
Kitchen extract system A view of Kitchen Extract fan
Refuse extract system Ceiling mounted diffusers in every garbage collection room Centralised ducting Fans are located at plant rooms.
Stairwell pressurisationand Lobby relief fans Both the stair wells will be Pressurised in the event of Fire to avoid smoke ingress.
Stairwell pressurisationand Lobby relief fans Lobby relief fans will ensure That lobbies are not over Pressurised. Motorised dampers are installed At every level which will open In the event of fire
Car park ventilation system Covers all the three parking levels View of the exhaust fan riser
Car park ventilation system View of fresh air intake plenum
Car park ventilation system Jet fans are located Throughout the parking Areas.
Car park ventilation system Axial fans are located In fan rooms with Motorised dampers And sound attenuators
Water supply system DEWA incoming supply will Be stored in the basement RCC tank Transfer pumps feed the mid- Level and roof tanks Gravity feed to apartments Penthouse and Loft apartments Will be having boosted water Supply Tenant water meters are located In mechanical room at each level
Water supply system GRP tank in the Plant room
Water supply system A view of tenant water Meter arrangement
Water supply system View of PRV station For water supply system
Hot water system Decentralized system Each apartment will have One dedicated water heater.
Drainage system • Soil waste and vent systems • FIC’s located at grade level close to perimeter wall inside the sector • Grease traps have been provided for retail kitchen waste system. • Sump pumps have been provided for basement drainage.
Rain water system • Roof drains have been provided at roof and terrace levels • Balcony drains have been installed in all balconies • Collection and discharge through dedicated rain water stacks
Fire protection system One dedicated fire tank in the basement serving entire sector Fire pumps are on duty and Stand by basis Ring main at the basement Podium areas are divided into 7 fire zones
Fire protection system PRV stations have been located various levels Each floor has been provided with 2 fire hose reels and 2 Landing valves. All areas are sprinkler protected. A view of fire protection Branch off at typical floor
Fire protection system A view of PRV station
Special fire protection systems • MDF rooms have been protected by FM200 system
Special fire protection system LV rooms and generator rooms have been protected by CO2 System.
Building management system Fully integrated BMS has been provided covering all the towers And podium common areas. Main system with computer and printers are located in the Sector control room DDC’s are installed in all plant rooms. Remote monitoring and controlling of entire HVAC system is possible Supplier: Honeywell
Management training Thank You Any questions?