An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R2E Follow-Ups and Project R2E Meeting, September 8th 2010 M. Brugger

  2. R2E News & Announcements • Green light of R2E xMasActions (confirmed by email to J.C. Guillaume) • Report from the last LMC • MTP and impact on R2E -> Project Status • Equipment Inventories (in final approval process), see R2E Publications (1, 2, 3, 4) • xMas-Break Preparation meeting (news: Anne-Laure) • Introduction of Marco and Luisella • Luisella: • support for WBS, project documentation and planning • help with P8 calculations (monitoring benchmark) • help with P1/5 calculations (idem) • Marco: • Monte-Carlo Calculations (current focus: P8, P1) • H4IRRAD • Monitoring & Early Measurements • RadWG member, R2E Secretary • Next week announcements: • special RadWG meeting for H4IRRAD • discussion on safe-rooms (date/time to be defined) • Next R2E meeting:Thursday next week: main subject is the project mandate and organization

  3. Urgent R2E Actions Solution Finding / Clarifications & Decisions (follow-up): • P5 comparison of options (three ‘solutions’) and impact on planning/costs (Anne-Laure) • Open questions after CMS visit, see email Anne-Laure/Markus (Anne-Laure) • Open questions for solution with gallery, see emails following the discussion with Christoph and Martin (M. Gastal) • Gain between Bypass and UJ561 (cabling mainly),… -> Cost/Planningt (Anne-Laure) • How can the planning become shorter (e.g., cable installations in two shifts) • Shielding installation during xMasBreak: (Anne-Laure) • RRs: no due to risk and impact on power connections • UJ76: yes • UJ14/16: to be verified with consequences on adjacent inner triplet -> if no risk, then yes • Shielding Purchase: (Anne-Laure) • Table with shielding details per area, open questions, e.g., 2nd layer in US85 (Michael) • Reserve of 50% (of existing stock) – to be partly ‘compensated’ by new ‘reserve’ (Michael) • Installation of heavy blocks (>7t): Markus discussed with Serge and it might be feasible for the lower layers in the RRs, Serge will verify and keep us informed • Reserve in total amount: 10% • Status of complementary order (200 blocks) -> is this in the pipeline? (Michael) • Budget code to be defined for purchase, green light for divisional request (Roberto)

  4. Urgent R2E Actions Solution Finding / Clarifications & Decisions (follow-up): • P8 cable installation close to cryo installation: only those actions with no risk to operation to be performed (Anne-Laure) • Safe-Room P7/P5 solution finding (Markus) • Unlikely that shielding at P5 will be sufficient for operation until 2016 • Safe-room situation needs to be reviewed (see workshop), also for P7 • P7: VAC-racks -> Sylvain wanted to have a last iteration before the layout is frozen • P7: racks related to access -> details not clear (Sylvain), how much can be combined and could they also be switched off during operation (like access gates in P1/2/8)? (Anne-Laure) • P1 (UJ14/16) / P2 (UJ23) / P8 (UJ87) access gates: oral agreement on procedure -> to be clarified that we don’t relocate the access gate and it’s the equipment owner’s responsibility to assure the implementation of the procedure (Anne-Laure) • P8 shielding verification • Preliminary update of simulations shows that the shielding of the safe-room is coherent with the future shielding of the cryo-racks and towards the UW85 (Marco) • Additional simulations ongoing in order to verify comparison with monitors, as well as the long-term need/possibility of a second shielding layer

  5. Start of Mid-Term Activities • SCL R&D (Amalia) • Started • Cable tests scheduled, in time for 2011 goal • WG will be created and keep direct contact with R2E • Power-Converter R&D (Yves) • R&D is in the medium-term plan, activity to be started now • Fellow will arrive or is already there • First steps: • First conceptual design studies • Radiation tests of existing power-converters • Aiming for a first conceptual design review in autumn 2010 • Discussion with TE/EPC and F. Bordry to be organized (Markus) • H4IRRAD (Marco) • Generic calculations available • No showstopper so far • Next step: detailed layout, requirements (TE/EPC), RP issues • Aiming for radiation tests in February/March • Special RadWG scheduled for next week

  6. Reports and Follow-Ups Reports -> responsible (deadline) : • ECR Fire/ODH (all points) -> S. Grau/M. Gastal/ A.L. Perrot (October 2010) • ECR Point-8 -> A.L. Perrot (October 2010) • ECR Point-1 -> A.L. Perrot with support from F. Butin (October 2010) • ECR Point-5 -> A.L. Perrot with support from M. Gastal(November 2010) R2E Mitigation Project [follow-up]: • Project structure and mandate to be defined (confirmed) [Markus] • Budget Codes (see proposal) to be allocated (Roberto) • Work-Breakdown structure for iteration with groups and preparation for putting it into CERN planning [Luisella, Markus] • Power-Converter R&D to be launched [Yves] • H4IRRAD to be made possible [Marco, Bart, Ilias] • SCL R&D: already launched [Amalia]

  7. R2E Mitigation Project Roles & Deliverables Roles: • Project planning and coordination • Assurance of global mitigation actions and their implementation within the LHC planning • Long-term solution for power-converters & evaluation of options • Support for all linked R2E activities and assurance of availability of requirements (e.g., test areas) • Creation of ‘R2E culture’ & formalization of corresponding rules Deliverables: • Mitigation Plan & Required Documentation • Evaluation of Radiation Levels & Consequences • Budget/resources/timing details & reporting • Availability of radiation facilities and radiation test support • R2E Policy

  8. Mandate R2E Project & Study Group “The R2E Mitigation Project decides on action priorities, assures a mitigation plan within the LHC planning constraints and steers all R2E mitigation actions. Together with the R2E Study Group it assists LHC operations and equipment groups with expert knowledge and assessments of radiation-induced failures in electronics of the accelerator. The R2E mitigation project is steered by the R2E study group which directly reports to the LMC” R2E Study Group Responsibilities: • Forum and steering meeting for R2E Mitigation Project • Development of a radiation policy for the accelerator sector • Direct link with related activities within the PH department • Advising and coordination role for all R2E related subjects and working groups • Availability of radiation test possibilities according to LHC requirements R2E Mitigation Project Responsibilities: • Minimizing the risk of LHC failures caused by radiation effects on electronics • Development and implementation of a R2E mitigation plan coherent with the LHC schedule • Evaluation based on radiation monitoring and calculations • Study of patch-solutions and radiation tolerant developments • Support and review of R&D for radiation tolerant power-converters • Study, feasibility analysis and final proposal of long-term mitigation solution • Budget planning, steering and optimization of all mitigation actions • New radiation test facilities and possibilities within the requirements of the R2E project Linked Activities: • Collimation upgrade at IR3 (IR7->3 Move) • SCL R&D • New radiation test facility in the PS East-Area

  9. Monitoring & Mining WG Mandate: • Early monitoring around the LHC critical (R2E) areas • Comparison (“benchmarking”) with expected radiation levels • Coordination of required Monte-Carlo calculations • Improvements for the combined monitoring tool & related issues • Possible required improvements for monitor locations & numbers • Extrapolation towards nominal LHC operation • Development of a standardized reporting of radiation levels Members: • RadMons: D. Kramer, G. Spiezia, K. Roeed • Ramses: S. Roesler • BLM: A. Nordt • TLDs: M. Brugger, A. Thornton • Monitoring Tool: M. Pinheiro • Data-Mining and Pre-Analysis: A. Thornton • Monte-Carlo Calculations: M. Calviani, K. Roeed, M. Brugger • Radiation Damage: K. Roeed • Operation: M. Pojer • R2E: Markus • Chair: M. Calviani Needs a Name

  10. ??? Reporting and Steering Structure LHC Machine Committee LHC Machine Committee R2E Study Group Point-Owners R2E RadWG R2E Mitigation Project Monitoring MM WG RadWG ICL ??? PC R&D Testing Related Working Groups Equipment Owners SLC R&D CWG Installations NIFWG Electronics Policy

  11. R2E Mitigation Project (Communication) R2E MitigationProject(Steering: R2E Study Group) LMC Radiation Testing Monitoring Power Converters Integration &Implementation Support Test Facilities Super Conducting Links Collimation New-Irradiation Facilities WG: PS East-Area Facility Data Monitoring & Mining WG: Calculations Monitoring & BenchmarkingRadiation Levels in Critical Areas ICL Meetings: Shielding Relocation Coordination • Organization Planning Safety Radiation Tolerant Power-Converter WG: R&D & ConceptDevelopment Testing (Procurement) SCLs -WG: R&D & TestsHor. SCLs • Vert. SCLs (Procurement) Collimation-WG: Betatron @ Point-3 Radiation-WG: Failure Analysis Radiation TestsPatch Solutions & New DevelopmentsRadiation Policy RelatedWorkingGroups

  12. Project & Steering Members Linked: • Collimation: R. Assmann • Super-Conduction Links: A. Ballarino • Civil Engineering: J. Osborne • Operation: M. Pojer • Consolidation: S. Baird • New Irradiation Facilities: L. Linsen Permanent: • Planning: K. Foraz • Project Support: S. Weisz • Integration: A.L. Perrot • Radiation Working Group: G. Spiezia • Power-Converters: Y. Thurel • Monitoring & Calculations: M. Calviani • Operation: M. Pojer • Radiation Protection: S. Roesler • General Safety: required? (EN/DSO, R. Trant to be contacted) • R2E Study Group Chair: R. Losito • Scientific Secretary: M. Calviani • Project Assistant: L. Lari • Project Leader: M. Brugger Reporting: • LMC: S. Myers

  13. R2E Mitigation Project (Communication) R2E MitigationProject(Steering: R2E Study Group) LMC S. WeiszK. ForazS. Roesler S. Myers R. Losito M. Brugger Radiation Testing Monitoring Power Converters Integration &Implementation Super Conducting Links Collimation Test Facilities Support Data Monitoring & Mining WG: Calculations Monitoring & BenchmarkingRadiation Levels in Critical Areas New-Irradiation Facilities WG: PS East-Area Facility ICL Meetings: Shielding Relocation Coordination • Organization Planning Safety Radiation Tolerant Power-Converter WG: R&D & ConceptDevelopment Testing (Procurement) SCLs -WG: R&D & TestsHor. SCLs • Vert. SCLs (Procurement) Collimation-WG: Betatron @ Point-3 Radiation-WG: Failure Analysis Radiation TestsPatch Solutions & New DevelopmentsRadiation Policy R. Assmann A. Ballarino A.L. PerrotY. Muttoni M. Brugger-> G. Spiezia Y. Thurel RelatedWorkingGroups L. Linssen M. Calviani