1 / 23

P09454: Design & Testing of Centrifugal Pump Components

P09454: Design & Testing of Centrifugal Pump Components. MSD II –Managerial Presentation Spring 2009. Design Team:. Rishitha Dias - ISE – Project Manager Kevin Klucher - ME – Lead Engineer John Hayles - ME Reme Meck - ME Ammar Jangbarwala - ME. Project Background:.

lobo
Download Presentation

P09454: Design & Testing of Centrifugal Pump Components

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P09454: Design & Testing of Centrifugal Pump Components MSD II –Managerial Presentation Spring 2009

  2. Design Team: • Rishitha Dias - ISE – Project Manager • Kevin Klucher - ME – Lead Engineer • John Hayles - ME • Reme Meck - ME • Ammar Jangbarwala - ME

  3. Project Background: • Project Family: Sustainable Technologies for the Global Marketplace • Project Track: Flow Visualization • Sponsor: Dresser-Rand Corp. • Faculty Guide: Dr. S. Day

  4. Project Deliverable: The goal of the project is to design, build, test and deliver to KGCOE, a centrifugal pump system for particle imaging velocimetry (PIV) studies, which can be used both as a teaching tool for undergraduate students as well as a research tool for graduate and faculty researchers.

  5. Customer Needs: Primary Customers: • Faculty & Graduate Researchers • Undergraduate Instructors Customer Needs / Target Specifications: • Generate Multiple Flows ~ 3 Unique Impeller Designs ~ 2 Unique Diffuser Designs • PIV Compatibility >85% Transmissivity of Pump Components • Lab Teaching Tool < 5 min Component Swap Time > 0.45” Tool Clearance Measureable Flow, Pressure & Power. Parts must withstand a drop from 42”

  6. Inherited Pump System: Sensors & Actuators GUI Close-up view of Pump Housing & Impeller Tank

  7. System Architecture:

  8. Design Concept Summary Impeller & Diffuser Riser

  9. Deliverable Status:

  10. Impeller Designs Previous Impeller Design: New Impeller Designs: P09454-102 P09454-103 P09454-104 P09454-105 P09454-106

  11. Impeller Designs Old Impeller Design:

  12. Diffuser Designs P09454-203 P09454-201

  13. Pump Housing:

  14. Project Status:

  15. Budget: • > 40% of the $6,500 budget remaining • Component Manufacture & Materials costs are dominant.

  16. Schedule:Product development Phase Phase 1 Planning Current Stage of Design Phase 2 Concept Development System Level Design Phase 3 Testing & Refinement Phase 4 MSD I MSD II

  17. Schedule: • Project is on Schedule • Component Manufacture Complete • Pump Assembly Complete • Flow Testing Complete • Documentation Complete

  18. Performance: • Measure Pressure, RPM & Flow • Built into GUI functionality • Control Flow, RPM, Pressure • GUI Controls & Valves • PIV Compatible • Clear Acrylic Components • Characterize Various Flows • 5 Impellers & 2 Diffusers available to generate curves • Interchangeable Components • Assembly/Disassembly averages 3.5 minutes

  19. Results:

  20. Test Results • As head rises, the flow decreases, demonstrating basic pump curve relationships. • With the addition of a vaned diffuser, the head generated is increased versus flat ring diffusers.

  21. Discussion • Pump provides 10x the options (impeller and diffuser) with 65% faster component switch time • Head generated is up to 60% greater than previous system benchmarks • Flow rate is not up to maximum theoretical value of 22.3 gpm. However, ~ 25% increase over previous iteration • Diffuser made a large difference in the amount of head generated, up to a 27% increase for the basic 102 impeller • New designs can be rapid prototyped and tested in the test loop within several days based on standard dimensions used for the components