1 / 7

Mead-Phoenix Project

Mead-Phoenix Project. Mike Olson. Manager, Transmission Planning. Western DSW. HISTORY. Pacific Northwest – Pacific Southwest Intertie Project Part of the southern portion Redefined as AC project in 1989 256 miles of 500 kV, 1300 MW. TERMINALS. Westwing, near Phoenix

locke
Download Presentation

Mead-Phoenix Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mead-Phoenix Project Mike Olson Manager, Transmission Planning Western DSW

  2. HISTORY • Pacific Northwest – Pacific Southwest Intertie Project • Part of the southern portion • Redefined as AC project in 1989 • 256 miles of 500 kV, 1300 MW

  3. TERMINALS • Westwing, near Phoenix • Marketplace, near Boulder City • Interconnects with Mead substation

  4. MEAD-PHOENIX Project

  5. MEAD-PHOENIX Project

  6. OWNERSHIP • APS 18% • MSR 12% • SCPPA 18% • SRP 18% • StarTrans 2% • Western 32%

  7. Thank You!

More Related