Mead Substation. Mike Olson. Manager, Transmission Planning. Western DSW. MEAD SUBSTATION. MEAD SUBSTATION. HISTORY. 1935 Pacific Northwest Regional Planning Commission 1949 USBR Report (BPA-CVP Intertie) 1960 DOI Report indicates intertie feasibility

mattox
Download Presentation

Mead Substation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mead Substation Mike Olson Manager, Transmission Planning Western DSW

  2. MEAD SUBSTATION

  3. MEAD SUBSTATION

  4. HISTORY • 1935 Pacific Northwest Regional Planning Commission • 1949 USBR Report (BPA-CVP Intertie) • 1960 DOI Report indicates intertie feasibility • 1961 Report recommends intertie construction

  5. HISTORY CONT’D • 1964 Congress authorizes the Intertie Project • 1967 Mead substation construction contracts awarded • 1969 Hoover DC line was postponed